7
5.7.
RESERVOIR MAXIMUM LEVEL SENSOR KIT (OPTIONAL)
PROXIMITY LASER PROBE
6.
UNPACKING AND INSTALLATION
6.1.
UNPACKING
Once the suitable installation location has been identified, open the packaging, remove the pump and ensure that it has not
been damaged during transport and storage. The packing material does not require special disposal precautions as it is in no
way dangerous or pollutant. For disposal, refer to local regulations.
6.2.
INSTALLATION OF THE PUMP
Position the electric pump and secure it to its support using the specific Ø9mm (0.354in) slots with 4 suitable screws.
Mount the pump so that the greaser for filling the tank and the control panel are easily accessible.
Leave at least 100 mm (3.94 in) perimeter distance from other equipment or obstacles that prevent access to the pump.
Mount the pump at “labourer height” in order to prevent abnormal posture or possible impact.
Do not install the pump submerged in liquids and/or in particularly aggressive environments.
Do not install the pump in environments where there are explosive or flammable mixtures.
Do not install the pump near heat sources or electrical equipment that may disrupt correct operation of the electronics.
Ensure that pipes and cables are appropriately secured and protected from any impact.
Ensure that the lubricant used is suitable for the operating temperature, especially below 0°C. For the correct choice of
lubricant, contact our Sales Technical Office.
6.3.
PLUMBING CONNECTIONS
The plumbing connection point to install the pump to the system is located on the pumping body with G1/4” thread for
"Progressive" pumping units and G1/8" for "Multi-line" pumping units. The possibility of having the return in pump with
G1/8” thread is provided.
WARNING: The piping must reach the point to be lubricated by the shortest possible route.
6.4.
ELECTRICAL CONNECTION
The electrical connection is the responsibility of the user who must provide unequivocal identification of the power supply
connection, inlet and output signals.
Connect the machine to the electrical line as indicated in this manual.
The power supply cable must be a suitable gauge for the absorption of the machine and it must be a type compliant with the
prevailing regulations. This can be ordered separately (See 14.ORDER INFORMATION)
Connector
(M12 - 4pin)
Laser probe
Proximity
Reservoir