5.4.2 Installing the start-off adapters
After choosing your output configuration, do the following to install the start-off adapters.
Warning: Use gloves to complete the following steps because the start-off adapters
and caps can be sharp.
1- Cut a notch in the flange of adapter
(A)
and slightly fold down one side of the
flange to facilitate installation.
2- Align the notch previously made on the
adapter
(A)
with the one of the hot air
outlet on the plenum, and then turn the
adapter until the flange is completely
inserted and rotates freely. Repeat the
above procedure for the other adapters
5.4.3 Minimum amount of outlets and maximum lengths of ducts
- A minimum of 6 start-off adapters must
be installed on the start-off plenum. The
location of the adapters has no impact
on the distribution of air.
Summary of Contents for DF01001
Page 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Page 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Page 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Page 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Page 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Page 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Page 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Page 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...