background image

 

6

switch 2 the third infrared quartz tube begins to hea, Press the power switch 3 the fourth infrared 

quartz tube begins to heat; Press the power switch 4 the fifth infrared quartz tube begins to heat; 

Press the power switch 5 the sixth infrared quartz tube begins to heat.

 

d. According to the instrument instructions and set the temperature to 450 DHS continuously 

heating  and  then  samples  will  gradually  stop  boiling,  and  then  began  to  change  color,  when  the 

sample color becomes completely transparent blue-green liquid continue heating 10-20 min, after 

digestion to complete at this time. Samples (such as moisture content is exorbitant, heating of the 

digestive wall with  black objects, the  heat  in two  stages:  first of all, first set  to a  temperature of 

200  degrees,  after  reaching  the  temperature  continue  to  heat  the  20-30  min,  and  then  reset  the 

temperature continue heating 30 to 60 min after 450 degrees, then the sample will gradually stop 

boiling, and  then  began  to  change  color,  when  the  sample  color becomes completely  transparent 

blue-green liquid continue heating 10-20 min, after digestion to complete at this time.) 

Generally,  the  time  required  is  60-90min  from  the  boot  to  the  sample,  which  is  determined 

according to the sample (the higher the nitrogen content, the longer the digestion time). 

e.  After  the  digestion  is  completed,  it  will  be  moved  to  the  test  tube  cooling  rack  together 

with the tube digester and exhaust gas absorption device. 

Precautions 

 

a. The first answer extraction tee (suction filter pump) guarantee extraction tee three interface 

flow state of the suction filter pump) and figure B side hole must be kept with A, C and inner hole, 

to ensure that the digestive tube exhaust gas can be siphoned off, if there is A gas leak is more, you 

can check here for the suction filter pump is normal, can rotate B side to adjust its position. 

b.  When  installing  exhaust  gas  absorption  bottle,  pay  attention  to  the  sealing  ring  of  the 

sealing ring and the digestive pipe joint to prevent the waste gas from overflowing. (when taking 

the exhaust gas absorption bottle, first pour the bottle to one side and then take it off the whole, so 

as to avoid the pressure to bring the digestive tube together with the accident.) 

c.  Since  the  location  of  the  alimentary  canal  digestion  process,  the  surrounding  and  the 

temperature of the center position is a bit poor, so some sample color change first appeared in the 

process of digestion, these all belong to normal phenomenon, at the same time in order to ensure 

the  digest  completely,  may  be  extended  appropriately  digestion  time  or  increase  the  heating 

temperature. 

d.  After  the  digestion  is  completed,  the  water  source  cannot  be  closed  during  the  cooling 

phase, otherwise there will be residual waste gas overflow. 

 
 
 
 
 
 
 
 
 

Summary of Contents for DW-KDN-20D

Page 1: ...DW KDN 20D Drawell International Technology Limited Shanghai Drawell Scientific Instrument Co Ltd Add Suite 1506 Lane581 XiuChuan Rd PuDong New Area Shanghai China Tel Fax 0086 21 50966080 Web www dra...

Page 2: ...res 3 2 Technical Parameters 3 Method of connection of digester furnace 4 Digestion furnace temperature control 5 1 Temperature control instrument button description 5 2 Temperature setting 5 Method o...

Page 3: ...e message please give the message and we express our heartfelt thanks for it Shanghai Drawell Scientific Instruments Co Ltd Tel 0086 21 50966080 Security warning Danger May constitute property damage...

Page 4: ...ronment requires no dust inflammable and explosive gas h The working environment temperature is 10 45 degrees relative humidity is less than 80 i The instrument must be installed in a place without di...

Page 5: ...0ml c Capacity of digestive tube 300ml standard d Determination range 240mgN e Temperature control range at room temperature to 550 f Heating rate 60 degrees min g Temperature control accuracy 1 h Pow...

Page 6: ...onnection The filter contains 500 1000ml of lye which is neutralized by harmful gases such as SO2 which can be used to filter the harmful substances of adsorption particle Note The above is a descript...

Page 7: ...o increase or decrease according to the required temperature value When the value of display window reaches the required temperature value ie After the setting is completed press to confirm Method of...

Page 8: ...r the digestion time e After the digestion is completed it will be moved to the test tube cooling rack together with the tube digester and exhaust gas absorption device Precautions a The first answer...

Page 9: ...0 holes 1 3 Digestive tube cooling rack 20 holes 1 4 Digestive tube 40 300mm 20 5 Exhaust absorption 50 280mm 5 6 Exhaust gas absorption bottle seal 55 28mm 20 7 Extraction tee Teflon 3 8 Power cable...

Page 10: ...8 Drawell International Technology Limited Shanghai Drawell Scientific Instrument Co Ltd...

Page 11: ...9 Add Suite 1506 Lane581 XiuChuan Rd PuDong New Area Shanghai China Tel Fax 0086 21 50966080 Web www drawell com cn Email sales01 drawell com cn...

Reviews: