page 12 of 32
Foundation
™
for LED Panels
STUD
GYPSUM
BOARD
WALL
Mounting
Hardwar
e
(by others)
STUD
PLYWOOD BACKER
GYPSUM
BOARD
WALL
Mounting
Hardwar
e
(by others)
OR
Fig. 3.3
Section 3.2 - Marking Vertical Mounting locations
STUDS
SHOWN
Fig. 3.2-1
Section 3.2.1 - WOOD/METAL STUD INSTALLATION
1.
Locate the wall studs and mark their location at the intersection of the
lines drawn in Section 3.1.
MAX. WALL
BRACKET SPACING:
24"
(610mm)
to 32"
(813mm)
Fig. 3.2-2
Please Note:
It is the responsibility of the installer to select mounting
hardware appropriate for the mounting surface
9
/
16
"
(
Ø
14mm)
Ø
13
/
16
"
(
Ø
20mm)
Ø
5
/
16
"
(
Ø
7mm)
LASER LINE
Mounting
Hardware
MOUNTING
BRACKET
DETAIL
Section 3.3 - Attaching Mounting Hardware
(by Others)
to Wall
1.
Loosely attach the wall mounting hardware
(provided by others)
to the wall at the outer four corners of the grid created in Sections 3.1 & Section 3.2.
Ensure the head of the hardware is at least
1/2
”
(12mm)
off the surface of the wall.
The assembled Horizontal Rails will be hung from these in SECTION 5 - Hanging Horizontal Rails.
Section 3.2.2 - CONCRETE, BLOCK OR BRICK INSTALLATION
1. Draw vertical lines spaced 24"
(609mm)
to 32"
(813mm)
apart.
MIN: .25" x 1.75" L
HEX HEAD LAG SCREW
BY OTHERS
MOUNTING LAG SCREW
BY OTHERS MIN: .25" x 1.75" L
Must attach to studs or
1/2" Plywood Backer
Summary of Contents for Foundation
Page 1: ...FORM FDN_Unilumen_Inst21 R ...
Page 32: ...FOUNDATION ...