Drawing 7: Platform Folding Assy 

V1 

40-A-00657-A 

 

Summary of Contents for LF750

Page 1: ...Manual V 1 7 LF750 LIFTER USER MANUAL Applicable to LF750 Mk1 MC No 001...

Page 2: ...10 Checks Before Starting 10 Starting Procedure 10 Stopping the Machine 11 Emergency Stopping 11 Tracking the Machine 12 Tracking Controls 12 Checks Before Tracking 12 Tracking Procedure 12 Lifting an...

Page 3: ...azardous Materials and End of Machine Life 22 Battery Safety Information 23 Safety Advice 23 Fire and Explosion Data 23 Storage and Handling Use 23 Warranty Statement 24 Declaration of Conformity 26 I...

Page 4: ...l level 20 Figure 11 Grease Nipples and Pins 21 Figure 12 Track Tension 21 Figure 13 Identification Plate 27 List of Part Diagrams Drawing 1 Track Tensioner Wheel Lower Roller Assy 35 Drawing 2 Track...

Page 5: ...hird party injuries The machine must be properly operated and maintained to keep it in a safe and efficient functioning condition Ensure that all controls are free of mud grease or other matter that m...

Page 6: ...ge 5 of 47 Specifications Width 700mm Length 2 000mm Height 1960mm Weight 630 Kg SWL 750 Kg Log Grab 1250mm max opening Engine Power 10kW 14 HP Start Electric and Recoil Fuel Petrol Figure 1 LF750 Lif...

Page 7: ...ion Control Tower Guard Protects valves from the environment Hose Guards Prevents damage to hoses These guards may be removed for maintenance only however the operator must ensure guards are in place...

Page 8: ...djustments undertaking maintenance refuelling or cleaning Always ensure there is no risk of the machine moving during operation Be aware of slope inclines and surface conditions If there are any fluid...

Page 9: ...ith the Control of Noise at Work Regulations 2005 Noise Regulations 2005 to prevent or reduce risks to health and safety from exposure to noise at work Refuelling Follow standard Health and Safety pra...

Page 10: ...at right angles to the slope and block tracks securely Remove the key to a place of safety NOTE Always park the machine with the auxiliary attachment in contact with the ground NOTE Ensure the equipm...

Page 11: ...eed immediately after starting Always allow the engine to fully circulate lubricant and warm up gradually before operating at full speed and load Move throttle lever in direction of BLUE arrow to the...

Page 12: ...turn off engine Emergency Stopping Should the machine need to be stopped in an emergency push the E Stop button This is located on the Track Tower Control Panel The engine cannot be restarted until t...

Page 13: ...er than 10 degrees or loading onto a trailer track the lifter in reverse so the operator is above the LF750 Lifter see Figure 5 Maximum side traverse angle on a slope is 20 when unloaded see Figure 5...

Page 14: ...e Limits Figure 6 Operation When Loaded Always stay uphill of the machine while tracking DO NOT track the machine on slopes greater than 20 When loaded ensure ground is level and stable NEVER step off...

Page 15: ...rigger Control Lever pushing the lever forwards lowers the Outrigger and pulling the lever backwards raises the Outrigger 4 Aux Control Lever moving the lever forwards or backward has the opposite act...

Page 16: ...couplers faces are clean of dirt or grime Connect the hydraulic hoses to the auxiliary service ports on the top of the boom Disconnection advice Operate the accessory several times to relieve any pres...

Page 17: ...m and Dipper control levers then open the Log grab 3 Close the log grab jaws around the timber NOTE Ensure the TIMBER IS EVENLY DISTRIBUTED before lifting 4 Lift the load and place onto the cargo bay...

Page 18: ...lever is fully across The engine will not crank o Battery charge low charge as required or replace o Use the Hand Pull to start the engine This will also charge the battery o Fuel lever not been turn...

Page 19: ...preventive maintenance The instructions regarding types of lubricants and the frequency of their application must be followed to prolong the life of the machine Periodic lubrication of moving parts he...

Page 20: ...nual Every 600 Hours or Every 3 years Replace air filter Refer to engine manual Annually Replace spark plug Service fuel system Service cooling system1 Check valve clearance2 Change hydraulic oil and...

Page 21: ...uitable container Undo filter cap as shown in Figure 9 Partially remove the filter and allow oil to drain for five minutes Clean the magnet and refit the drain plug Note presence of excessive debris R...

Page 22: ...1 Grease Nipples and Pins Grease Track Tensioners The correct tension is about 10 15mm up and down movement over the length of the track Avoid over tensioning tracks Aside from causing unnecessary wea...

Page 23: ...TERIALS ARE AVAILABLE ON REQUEST REFER TO THESE FOR FIRST AID AND FIRE PROTECTION MEASURES Recommended procedures and safety precautions must be followed for safe handling removal and disposal of haza...

Page 24: ...oltage conditions Damaged or opened cells or batteries may result in rapid heat and the release of flammable vapours Storage and Handling Use Do not store batteries in a manner that allows terminals t...

Page 25: ...nd any materials used to carry out routine servicing are not covered by this warranty Service items including lubricants coolants filters spark plugs drive belts leaks oil and air Plus paintwork wear...

Page 26: ...g That the failure is to be covered under the terms and conditions of the warranty If this is the case then the costs will be covered by Dragon Equipment Ltd If the failure is determined to be non war...

Page 27: ...Manual V 1 7 Page 26 of 47 Declaration of Conformity...

Page 28: ...ode chassis serial number power and machine weight can be found on the serial number plate This plate is located on the rear left hand side of the machine and the serial number should always be refere...

Page 29: ...Left and Right 1 No Off 30 D 00414 A Read the Manual Before use 1 No Off 30 D 00923 A SWL 750 Kgs V1 2 No Off 30 D 00378 A Lifting Eye For Machine Weight Only 2 No Off 30 D 00379 A Hold Down Point 6 N...

Page 30: ...1 A Part of how to start the engine 1 No Off 30 D 00950 A CAUTION Keep Hands Out V2 Small 2 No Off 30 D 00416 A Noise Level Wear Ear Protection 1 No Off 30 D 00929 A Lever Controls V1 184x64 1 No Off...

Page 31: ...Manual V 1 7 Page 30 of 47 Electrical Circuit Schematic...

Page 32: ...ist Item Part No Description Quantity Hour Meter 30 B 00693 A Hours Counter V1 1 Cable 30 B 00951 A Cable RPM Sensor V1 1 Cable 30 B 00952 A Cable Twin Core E Stop V1 1 E Stop 30 B 00692 A E Stop Butt...

Page 33: ...Manual V 1 7 Page 32 of 47 Hydraulic Circuit Schematic...

Page 34: ...ade 32 25Ltr 1 1 30 B 00718 A Level Gauge Hydraulic 1 2 30 B 00715 A Breather Hydraulic Tank V1 1 3 30 B 00201 A Filter Body V1 1 30 B 00720 A Filter Hydraulic V1 1 4 30 B 00203 A GRP 2 GRP 2 Tandem P...

Page 35: ...00W V3 37 Drawing 4 Hydraulic Tank Assy V1 38 Drawing 5 Petrol Engine Pump Assy V1 39 Drawing 6 Track Tower Assy V3 40 Drawing 7 Platform Folding Assy V1 41 Drawing 8 Tracking Power Unit Briggs 4W700W...

Page 36: ...Manual V 1 7 Page 35 of 47 Drawing 1 Track Tensioner Wheel Lower Roller Assy 30 A 00175 A 30 A 00054 C...

Page 37: ...Manual V 1 7 Page 36 of 47 Drawing 2 Track Assy 180x60x47 RH LH V1 30 A 00659 A...

Page 38: ...Manual V 1 7 Page 37 of 47 Drawing 3 Track Base 4W700W V3 40 A 00538 A...

Page 39: ...Manual V 1 7 Page 38 of 47 Drawing 4 Hydraulic Tank Assy V1 30 A 00193 C...

Page 40: ...Manual V 1 7 Page 39 of 47 Drawing 5 Petrol Engine Pump Assy V1 40 A 00542 A...

Page 41: ...Manual V 1 7 Page 40 of 47 Drawing 6 Track Tower Assy V3 40 A 00635 A...

Page 42: ...Manual V 1 7 Page 41 of 47 Drawing 7 Platform Folding Assy V1 40 A 00657 A...

Page 43: ...Manual V 1 7 Page 42 of 47 Drawing 8 Tracking Power Unit Briggs 4W700W 40 A 00960 A...

Page 44: ...Manual V 1 7 Page 43 of 47 Drawing 9 LF750 Head Unit Boom Dipper 40 A 00402 B...

Page 45: ...Manual V 1 7 Page 44 of 47 Drawing 10 LF750 Head Unit OutRigger 40 A 00402 B...

Page 46: ...Manual V 1 7 Page 45 of 47 Drawing 11 LF750 Head Unit Main 40 A 00402 B...

Page 47: ...Manual V 1 7 Page 46 of 47 Drawing 12 LF750 Lifter Machine Guards 50 A 00541 C...