background image

DR-130689-01

5/6

8

Current situation

4A

4B

OEM

Always connect

4B

4X

4A

4B

New situation

Connect control cable

6X

2

4

Smartbox placement & connectiong control cable

Summary of Contents for smartbox 2

Page 1: ...Manual BMW smartbox 2 WWW jekillandhyde com sales jekillandhyde com R18 2020 NEW in this manual 2020 model Instruction video SN 1 6 DR 130689 01 ...

Page 2: ... TR 16x B1 PC W1 9x 1x 2x BR 1x B2 N1 8x 8x Re use at step 3 4x L R L L R 1 2 3 4 L Re use at step 4 2x OEM components may vary per R18 model Install bracket left right Install link pipe left right RHS link pipe nr 1280 LHS link pipe nr 1180 Slide header on fully rotate clamp to avoid leakage OEM OEM Header Heatshield box tighten at step 6 RHS bracket nr 1218 LHS bracket nr 1219 Keep clear of swin...

Page 3: ...1 5 Install exhausts left right 1 Slide exhaust on link pipe 2 Bolt exhaust to bracket Tighten bolts clamps at step 6 OEM 1 W1 B2 N1 2 1 3 LHS RHS LHS RHS 1 TR 2x B1 PC W1 1x 1x 2x B2 1x B1 PC W1 PC BR Servo motor positioning OEM 4 ...

Page 4: ...ader Heatshield box 1 300 km 186 mi 30Nm 22lbf ft 2x 300 km 186 mi 6Nm 4lbf ft 4x 300 km 186 mi 30Nm 22lbf ft 2x 3 4 5 6 300 km 186 mi 55Nm 40lbf ft 4x 7 place red washer behind OEM heatshield to improve position 1 300 km 186 mi 2 Nm 1 5 lbf ft 1x 3 2 1 B4 Option 2 1 3 Install modeswitch cable routing OEM ...

Page 5: ...DR 130689 01 5 6 8 Current situation 4A 4B OEM Always connect Always connect 4B 4X 4A 4B New situation Connect control cable 6X 2 4 Smartbox placement connectiong control cable ...

Page 6: ...DR 130689 01 6 6 9 10 4P 4X 2P 2X 6P 6X Avoid Bending near the connector Sufficient cable length for slack 1 TR 3x Cable routing connecting smartbox L L 1 2 Complete System Check ...

Reviews: