A-4
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and accessories.
Install the legs on the oven.
1. To the electrician.
Electrical supply installation must be in accordance with the electrical rating on the nameplate.
WARNING
The electrician must make sure that the supply cable does not come in contact with the
oven top which becomes hot.
INSTALLATION
Summary of Contents for FC16
Page 10: ...A 9 INSTRUCTIONS TO REMOVE THE BELT ON THE CONVEYOR ...
Page 11: ...A 10 ...
Page 12: ...A 11 ...
Page 13: ...A 12 ...
Page 16: ...SECTION B DIMENSIONS ...
Page 17: ...B 1 ...
Page 18: ...B 2 ...
Page 19: ...B 3 ...
Page 20: ...B 4 ...
Page 21: ...B 5 ...
Page 22: ...SECTION D HEAT DIFFUSER ADJUSTMENTS ...
Page 23: ...D 1 ...
Page 24: ...D 2 ...
Page 25: ...SECTION E COMPONENT PARTS ...
Page 26: ...E 1 ...
Page 28: ...E 3 ...
Page 30: ...E 5 ...
Page 32: ...SECTION G ELECTRIC SCHEMATICS ...
Page 33: ...G 1 ...
Page 34: ...G 2 ...