![Doyon DSF015 Instruction Manual Download Page 2](http://html1.mh-extra.com/html/doyon/dsf015/dsf015_instruction-manual_2525342002.webp)
DSF-A.DOC
11/02
2
CHAPTER 1
CAUTION
READ ALL INSTRUCTIONS
IMPORTANT
RECEPTION OF THE MERCHANDISE
Take care to verify that the received equipment is not damaged before signing the delivery
receipt. If a damage or a lost part is noticed, write it clearly on the receipt. If it is noticed after
the carrier has left, contact immediately the freight company in order that they do their
inspection.
We do not assume the responsibility for damages or losses that may occur during transportation.
For your safety, this equipment has been verified by qualified technicians and carefully crated
before shipment. The freight company assumes full responsibility concerning the delivery in
good condition of the equipment in accepting to transport it.
NAMEPLATE
Each machine has a nameplate fixed on the machine, with the general characteristics of the
machine.
1.
Serial number
2.
Model
3.
Date
4.
Phase
5.
Amperage
6.
Voltage
7.
Frequency
Summary of Contents for DSF015
Page 17: ...DSF A DOC 11 02 17...