A6
TROUBLESHOOTING
BEFORE CALLING FOR SERVICE,
ANSWERS TO THE MOST FREQUENT QUESTIONS
Always cut off the main power before replacing any parts. Take care of water piping and
electric cable.
Control parts on the front.
To remove parts from front panels, you have to
go on the top of the unit.
Control panel, proofer unit and refrigeration
units.
They are located on the top of the unit.
Questions
Solutions
The unit does not turn on when installed.
Check if the light is on.
Check if the proofer’s switch is on.
Check the breaker of the building.
Check the breakers located on the front and in
the electrical control panel on the top of the
unit.
The blower runs but the unit does not
produce heat.
Make sure that the thermostat is adjusted to the
desired temperature (over ambient temperature)
and that the pilot light is lit. Check the breakers
in the electrical control panel.
The blower runs but the unit does not
produce steam.
Check humidity control settings. Verify if the
water valve of the building is open and if water
goes into the proofer’s unit located on the top
of the unit. Check if the water needle valve (of
the unit) is opened between a half to one turn.
Just close it and open it one turn maximum.
Check the breakers in the electrical panel.
Summary of Contents for DRIP1
Page 10: ...A8 ...
Page 12: ...SECTION B DIMENSIONS ...
Page 13: ...B1 33 86 46 1 2 40 1 2 DEVANT FRONT CÔTÉ SIDE F C PM AM 0 1 DRIP 1F DRIP1 ...
Page 14: ...B2 ...
Page 15: ...B3 67 84 0 1 AM PM C F E2 36 F E236 ...
Page 16: ...B4 ...
Page 17: ...B5 ...
Page 18: ...B6 97 3 4 84 F C PM AM 0 1 E3 36 F E336 ...
Page 19: ...B7 ...
Page 20: ...B8 ...
Page 21: ...B9 67 84 0 1 F C PM AM E4 60 F E460 ...
Page 22: ...B10 ...
Page 23: ...SECTION E COMPONENT PARTS ...
Page 24: ...E1 ...
Page 26: ...E3 ...
Page 28: ...E5 ...
Page 30: ...E7 ...
Page 32: ...E9 ...
Page 34: ...E11 ...
Page 36: ...SECTION G ELECTRIC SCHEMATICS ...