A-8
OPERATION OF THE PROOFER
1. Switch "ON" (1).
2. Set the thermostat control and humidity control according to the chart below.
Temp. F
RH +/-5% Hum. position
90
75
4
95
4 1/2
95
75
4
95
4 1/2
100
75
4
95
4 1/2
110
80
4 1/2
90
5
3. If there is too much fog and water drips from the glass doors, adjust humidity control to a lower
number.
4. When the temperature is stabilised, put the products in the proofer.
5.
IMPORTANT:
When proofing cycle is completed, turn the humidity switch to "OFF" and
let the motor blower and air heat element run for 10-15 minutes to let dry the proofer. Then, turn
the main switch ‘’OFF’’ (0), and leave the door ajar to prevent moulding.
When the proofer is not in operation, open the doors to let out the humidity and to prevent
mould.
P.S.
During operation, the doors should not be opened unnecessarily to conserve the heat and
humidity in the proofer.
USE SOFT WATER ONLY.
Cleaning the water pan on top of the proofer periodically can prevent mineral problems.
Summary of Contents for 5000 Series
Page 1: ...DRIP1 E236 E336 E460 series série 5000 Product Produit Serial number Numéro de série ...
Page 2: ......
Page 5: ...SECTION A DESCRIPTION DESCRIPTION ...
Page 18: ...A 14 A 14 ...
Page 19: ...SECTION B COMPONENT PARTS PIÈCES COMPOSANTES ...
Page 20: ...B 2 E236 FRONT E236 FACE B 2 ...
Page 22: ...B 4 DRIP1 TOP DRIP1 DESSUS B 4 ...
Page 24: ...B 6 E236 TOP E236 DESSUS B 6 ...
Page 26: ...B 8 E336 TOP E336 DESSUS B 8 ...
Page 28: ...B 10 E460 TOP E460 DESSUS B 10 ...
Page 30: ...WARRANTY GARANTIE ...
Page 33: ......
Page 34: ......