![Dover PSG ALL-FLO IOM A100 Series Installation Operation & Maintenance Data Download Page 14](http://html.mh-extra.com/html/dover/psg-all-flo-iom-a100-series/psg-all-flo-iom-a100-series_installation-operation-and-maintenance-data_2525008014.webp)
ALF-12050-E-02
All-Flo
14
STEP 7
In order to remove both “Outer
Chambers”, using two ½ inch
wrenches, remove eight “Hex Head
Cap Screws (5/16”–18 x 1-3/8”)”,
eight “Flat and Lock Washers
(5/16”)” and eight “Hex Flange Nuts
(5/16”-18)” from each side.
STEP 8
Remove both “Outer Chambers”
from the “Intermediate”.
STEP 9
Using two ¾ inch wrenches,
remove “Outer Diaphragm Plate”,
“Diaphragm”, “Inner Diaphragm
Plate” and “Bumper” from one
side of the pump.
STEP 10
Placing the ¾ inch wrench on the remaining “Outer Diaphragm Plate”,
and the 7/16 inch wrench on the “Diaphragm Rod Assembly”, remove the
remaining “Outer Diaphragm Plate”, “Diaphragm”, “Inner Diaphragm
Plate” and “Bumper” from the other side of the pump.
PUMP WET END ASSEMBLY
To assemble the wet end of the pump, reverse the order of disassembly.
Ensure all hardware is fastened in accordance with torque specifications
(see page 18). Inverting one of the diaphragms during reassembly will
facilitate ease of assembly.