![Dover PSG ALL-FLO A100 Installation Operation & Maintenance Download Page 17](http://html1.mh-extra.com/html/dover/psg-all-flo-a100/psg-all-flo-a100_installation-operation-and-maintenance_2524998017.webp)
ALF-13150-E-01
All-Flo
17
PILOT VALVE ASSEMBLY
To assemble the pilot valve, reverse the order of disassembly. Should
process fluid have contact with the pilot valve O-Rings, they should be
replaced as swelling may occur and cause irregular operation. During
assembly, ensure that the open side of the lip-seals are facing outward.
Lubrication of the pilot sleeve assembly, with a non-synthetic lubricant,
is recommended in order to facilitate re-assembly into the intermediate.
Magna-Lube or Magna-Plate are recommended for assembly lubrication
(see detailed parts list for ordering information).
TORQUE SPECIFICATION CHART
RECOMMENDED TORQUE SPECIFICATIONS
1” Pumps
Manifold Bolts
100-110 in-lbs (11.3-12.4 N-m)
Chamber Bolts
75-85 in-lbs (8.48 - 9.61 N-m)
Air Valve Bolts
40 in-lbs (4.52 N-m)
Diaphragm Plates
165 in-lbs (18.6 N-m)
Note: Always torque the chamber bolts prior to the manifold bolts. When reassembling, loosely tighten all
external fasteners adjusting and aligning gradually, in an alternating fashion, tighten to torque requirements
listed above.
Note: When using pumps built with PTFE O-Rings, always replace with new PTFE O-Rings, since the original
O-Rings may not reseal the pump.