![Dover HYDRO HYDSPD0023 User Manual Download Page 13](http://html1.mh-extra.com/html/dover/hydro-hydspd0023/hydro-hydspd0023_user-manual_2524966013.webp)
13
2.O5 Electrical Connections
(continued)
Output: Distribution Manifold Solenoid Connection
The PLC controls the solenoids in the Distribution Manifolds through connections made on Bank X6 and X7. Channel
1 uses A20 through A29 for chemical delivery, A210 for the Calibration Vase, and M as the common ground. Channel
2 uses A30 through A39 for chemical delivery, A310 for the Calibration Vase, and M as the common ground.
Note:
The connector in the distribution manifold for the calibration vase solenoid
is always marked “11”
, even if less than
ten washers are being serviced.
Wire supplied by
installer, colors
may vary.
Output:
Air Assist Flush Connection
The optional Air Assist Flush system (if present) is controlled by the PLC using connections on Bank X6 and Bank X7.
Channel 1 uses A215 and M, while Channel 2 uses A315 and M, as shown below.
Channel 1
1) Brown Wire to M
2) Green Wire to A215
Channel 2
1) Brown Wire to M
2) Green Wire to A315
2.OO installation
(continued)
1
2
3
4
5
6
7
8
9
10
G
11
1
2
3
4
5
6
7
8
9
10
G
11
Channel 1 Distribution Manifold
Channel 2 Distribution Manifold
Channel 1 Assist
Channel 2 Assist
?