4.2
Assembly
Personnel:
Operator
+ additional qualification explosion pro-
tection
Protective equipment:
Protective workwear
Protective gloves
1.
WARNING!
Sources of ignition may cause explo-
sions!
Ensure a non-explosive atmosphere.
Fig. 2: Assembling
2. Screw the feed cup onto the thread of the
material connection (1).
3. Connect air hose to the air connecting
(2).
4. Check air hose for correct seating.
5
Commissioning
Personnel:
Operator
+ additional qualification explosion pro-
tection
Protective equipment:
Protective gloves
Safety boots
Protective workwear
Eye protection
Respiratory protection device
Use ear protection
Requirements:
Feed cup and air hose have been con-
1. Rinse the spray gun before filling it with
Using solvent for solvent-based paints
Use water for water-based paints
2. Create a trial spray pattern on a test work
piece.
Commissioning
05/2018
EcoGun 116 - MSG00017EN