1. Deposit the
Holder ERJ
frame on the base (1) and secure using #8-32 or M4 screws (2) and bolts (3) (Fig.
The holder can be installed in an experimental setup using 1/4 (or M6) screws and nuts.
2. Install the
Electrical Rotary Joint
in the
Holder ERJ
base (Fig.
) and secure it in place using the 3/4-32 UN secur-
ing bolt (Fig.
3. The
1x1 Fiber-optic Rotary Joint
must first be set up in the
Holder FRJ small
, using the directives in the
1x1 Fiber-
optic Rotary Joint User Manual
, to be installed. The
Holder FRJ small
is then be attached to the
Holder ERJ
frame (1)
using 1/4 (or M6) screws (2) and bolts (3) (Fig.
). See Figure
for the final result.
For installation using the
1x2 Fiber-optic Rotary Joint - Intensity division
or the
1x2 Fiber-optic Rotary Joint - Wave-
length division
, the rotary joint must first be installed in the
Holder FRJ large
using the directives in the
1x2 Fiber-
optic Rotary Joint User Manual
. The
Holder FRJ large
is then attached to the frame in the same fashion as with an
1x1 Fiber-optic Rotary Joint
. See Figure
for the final result.
(a)
With 1x1 Fiber-optic Rotary Joint
(b)
With 1x2 Fiber-optic Rotary Joint - Intensity
division
Figure 2.2:
Holder ERJ
Chapter 2. Operations Guide
7