Fully tighten all joint connectors (10) previously installed.
STEP 4
Attach the headboard rails (E) to right posts (C & D) with joint connectors (10) and Allen key
(8) as shown.
Secure the shelves (H & I) to right posts (C & D) with joint connectors (10) and Allen key (8)
as shown.
NOTE: Use the headboard rail (E) with the warning label attached to it in this step.