STEP 8
Attach the other guardrail leg (Q) to long guardrails (L) and top side rail (I) with flat head wood screws
(6).
Secure the guardrail leg (Q) (done in step 6) to top side rail (H) with flat head wood screw (6) as shown.
Place four wood dowels (5) into the holes in the bottom headboard top crosses (T). With the help of
another person, stack the top bunk onto the bottom bunk.
TWIN/FULL BUNK BED
DA6940E (ESPRESSO) / DA6940W (WHITE) / DA6940BL(BLUE) / DA6940BK (BLACK)
Summary of Contents for 0-65857-16788-7
Page 4: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE DA6940BK BLACK...
Page 5: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE DA6940BK BLACK...
Page 6: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE DA6940BK BLACK...
Page 7: ...TWIN FULL BUNK BED DA6940E ESPRESSO DA6940W WHITE DA6940BL BLUE DA6940BK BLACK...