Maintenance
Operating & Maintenance Manual
Book: 22846471 (3-09-07) Rev. B
65
bracket
‘C’
to the main bracket
‘J’
. (continued on next page).
Allow the cylinder to return to its extended position and reconnect the ballast spring
‘A’
.
CAUTION
!
Ensure all components are aligned and move freely.
Start engine: Note receiver pressure. Warm up pressure should be 3,5-5,0 bar (50-70 p.s.i.).
To increase the warm up pressure, turn the air cylinder rod in an anti-clockwise direction to open the butterfly valve.
To reduce warm up pressure, turn air cylinder rod in clockwise direction to close butterfly valve.
When the engine is warmed up, press the service air switch on the control panel to commence normal regulation.
Set pressure by adjusting the screw
‘E’
on the pressure regulator
‘F’
. Turn the screw clockwise to increase pressure
and anticlocwise to reduce pressure.
RATED OPERATING PRESSURE: XHP - 300 psig, SHP - 250 psig
Book:46623600 (10-12-2012) Rev. A
Summary of Contents for HP900
Page 2: ...2...
Page 8: ...Book 22846471 3 09 07 Rev B 7 Foreword Book 46623600 10 07 2012 Rev A...
Page 12: ...Book 22846471 3 09 07 Rev B 11 Safety Book 46623600 10 12 2012 Rev A...
Page 20: ...Book 22846471 3 09 07 Rev B 19 Noise Emission...
Page 26: ...Book 22846471 3 09 07 Rev B 25 General Information Book 46623600 10 12 2012 Rev A...
Page 32: ...Book 22846471 3 09 07 Rev B 31 Operating Instructions Book 46623600 10 12 2012 Rev A...
Page 50: ...Book 22846471 3 09 07 Rev B 49 Maintenance Book 46623600 10 12 2012 Rev A...
Page 71: ...70 Always use Ingersoll Rand Replacement parts Always Use DOOSAN Replacement Parts...
Page 72: ...Book 22846471 3 09 07 Rev B 71 Machine Systems Book 46623600 10 12 2012 Rev A...
Page 78: ...Book 22846471 3 09 07 Rev B 77 Fault Finding Book 46623600 10 12 2012 Rev A...
Page 84: ...Book 22846471 3 09 07 Rev B 83 Options Book 46623600 10 12 2012 Rev A...