
Disassembly and Reassembly of Major Components
- 54 -
●
Remove the flywheel ring gear.
- Heat the ring gear evenly with a gas
burner (up to 200°C) to invite volumet-
ric expansion.
- Tapping around the edges of the ring
gear with a hammer and brass bar to
remove it.
Caution:
Do not damage the flywheel.
3.1.28. Flywheel housing
●
Remove the flywheel housing fixing bolts
and take them out.
●
Remove the oil seal from the flywheel
housing.
3.1.29. Crank shaft
●
Remove the bolts from bearing caps.
●
Remove the main bearing cap fixing bolts
in the reverse order of assembling.
●
Maintain the removed bearing caps in the
order of cylinders.
●
Temporarily install the bolts at the both
side of crankshaft, and lift the shaft with a
rope.
EA0M4028
Oil seal
Thrust washer
EA6M2010
EFM2029I
EA6M2011
1
3
5
7
6
4
2
Summary of Contents for GV158TIC
Page 1: ...950106 058010EN GV158TIC GV180TIC GV222TIC GAS GENERATOR ENGINE Operation Maintenance Manual...
Page 2: ......
Page 6: ...6 Engine Installation 143 6 1 Installing 143 6 2 Inspection Prior to Installation 144 Appendix...
Page 130: ...Electrical equipment 124...
Page 148: ...Maintenance of major parts 142...
Page 152: ...Engine installation 146...
Page 162: ...Appendix 156...