![Donjoy DJ-JZ1-130 Operation And Maintenance Manual Download Page 8](http://html1.mh-extra.com/html/donjoy/dj-jz1-130/dj-jz1-130_operation-and-maintenance-manual_2520932008.webp)
JZ1 SERIES PUMP
4.3 Crane transportation instructions
• "Warning", pay attention to parts falling, which may cause serious injury, bruises and even death.
To prevent falling during transportation, use a suitable lifting tool.
• Please make sure that the crane and the rope have enough bearing and strength.
• Make sure nobody stay under pump
5 Store
5.1 Storage environment of the pump
• The pump shall be stored according to the following procedures:
1. Drain the pump medium and keep it dry. Store it in a dry environment.
2. Storage temperature should not be too high or too low,
suitable for storing temperature is 20
℃
to 25
℃
(rnormal temperature).
3. The storage environment shall be ventilated and dust-free.
4. All parts of the pump are required to rotate regularly (three months)
5.3 Restart to use
• After storage, please check the mechanical seal before restart to use.
6 Installation and use procedures
6.1 Installation safety instructions
• Make sure that each part is fixed during installation,
falling parts may cause damage to the pump, as well as injury to personnel.
• please wear labor protection shoes when installing.
• Fix bolt according to the specified torque, please check 11.1
《
Bolt Fixed Torque Table
》
• Use a torque wrench
6.2 Precautions for pump installation
• Confirm the installation environment of the pump,
explosion-proof pump should be used in the explosion-proof environment.
• The environment must be dust-free.
• Working environment temperature at-20
℃
to 40
℃
.
•The installation platform must be strong enough to support the whole pump.
• The installation platform must be horizontal.
•
Sufficient maintenance space must be guaranteed.
• Ensure the air circulation of the installation environment and promote the heat dissipation of the motor.
7