
CPRS-1400,1400D INSTALLATION MANUAL
Issue : 2004.07
ED : 0
CPRS-1400,1400D INSTALLATION MANUAL 2 /47
- CONTENTS -
1.
System Specifications
8
1.1
Electric Characteristics
...................................... 8
1.1.1
Input Characteristics
........................................ 8
1.1.2
Output Characteristics
...................................... 8
1.2
Safety Specifications
....................................... 9
1.2.1
Electro Magnetic Interference (EMI)
.......................... 9
1.2.2
Surge Voltage of Power Cable
............................... 9
1.2.3
Leaked Current
............................................ 9
1.3
Environmental Characteristics
............................... 9
1.3.1
Operating Temperature & Humidity
........................... 9
1.3.2
Storage Temperature & Humidity
............................. 9
1.4
Physical Specifications
...................................... 9
1.4.1
Dimension
................................................ 9
1.4.2
Weight
.................................................... 10
2
Package
10
2.1
Packing State
.............................................. 10
2.2
Transportation
............................................. 10
2.3
Unpacking
................................................ 10
2.3.1
Tools
..................................................... 10
3
Installation & Cabling
12
3.1
Exterior View of Rectifier System
............................. 12
3.1.1
Front View
................................................ 14
3.2
Preparation for Rack Installation
............................. 16
3.2.1
Rack Connection
........................................... 16
3.2.2
Fixing Anchor
.............................................. 17
3.3
Cabling
................................................... 18
3.3.1
Chassis Ground
............................................ 18
3.3.2
GND Connection
........................................... 19
3.3.3
Surge Observer Ground
..................................... 20
3.3.4
AC Input Connection
....................................... 20
3.3.5
BATTERY LVD Switch
...................................... 22
3.3.6
Installation of BATT Monitoring Module
....................... 22
3.3.7
BATT Cell Check Sensor Connection
......................... 23
3.3.8
Temperature Sensor Connection
............................. 25
3.3.9
Current Sensor per Battery Bank
............................. 25
3.3.10
Comm Cable Connection between Batt Cell Check Module &
Control Panel
......................................................... 25
3.3.11
Comm Cable and Alarm Cable Connection in Control Panel
..... 26
3.3.12
DC Output Connection
...................................... 32
3.3.13
Battery Cable Connection & Fuse Location
.................... 34
3.3.14
BAT FUSE ALARM
......................................... 36