background image

Downdraft Bench, DB-800

 6

1.  Make the electrical connections to the customer-

supplied safety disconnect switch, blower, and 

blower starter.

2.  Turn power ON at source.
3.  Turn the blower motor ON then OFF to check for 

proper rotation by referencing the rotation arrow 

located on the blower housing. A blower running in 

the wrong direction will still deliver approximately 

40% of its rated air volume making proper rotation 

extremely important.

 

To reverse rotation, single-phase power supply:

 

Follow manufacturer’s instructions on the motor’s 

nameplate.

 

To reverse rotation, three-phase power supply:

 

Turn electrical power OFF at source and switch any 

two leads on the output-side of the fan-motor starter.

1FU

2FU

3FU

1M

1OL

1T2
1T3

fan

motor

Disconnect

L1

L2
L3

1T1

1L1

1L2

1L3

208/230/460/575/60/3

Motor Starter Wiring Diagram

Industrial Light, Three-Phase Units

1.  Wire the light fixture to a 120-Volt power supply. 
2.  Install customer-supplied fluorescent bulbs.

Hinged Side Panels

The DB-800 is equipped with right and left, lift-off hinged 

side panels. Open or remove panels when working with 

items too large or awkward for the work surface. Keep 

the panels closed under normal operating conditions.

light fixture

L2 to Neutral

L1 to Power Lead

Single Phase Units
lights are prewired

Three Phase Units
wire light to 120-Volt power supply

Light Fixture Wiring

1FU

2FU

3FU

1M

1OL

1T2
1T3

fan

motor

Disconnect

L1

L2
L3

1T1

1L1

1L2

1L3

208/230/460/575/60/3

Summary of Contents for Torit DB-800

Page 1: ...and warnings in this manual DO NOT operate or perform maintenance on this collector until you have read and understood the instruction and warnings contained within this manual Downdraft Bench DB 800...

Page 2: ...ipment This manual has been supplied to assist with the installation operation and maintenance for the collector purchased Please read the manual before installing operating or performing maintenance...

Page 3: ...Support Framing 4 Collector Location 5 Site Selection 5 Hoisting Information 5 Standard Equipment 5 Electrical Wiring 5 Industrial Light Three Phase Units 6 Hinged Side Panels 6 Preliminary Start Up C...

Page 4: ...r control Donaldson does not provide engineering consulting services related to process or dust hazard analyses or code and standard compliance Complying with applicable codes and standards and managi...

Page 5: ...r allows on demand filter cleaning Replace filters easily with the one piece EZ Filter Pack and dispose of dust contained in the dust drawer from the front of the unit The Downdraft Bench provides exc...

Page 6: ...Filter Pack into the clean air chamber and discharges through the clean air outlet The DB 800 is an intermittent duty collector which means that filter cleaning cannot start until the fan is turned OF...

Page 7: ...te installation and service of this equipment All shipping materials including shipping covers must be removed from the collector prior to or during collector installation Failure to remove shipping m...

Page 8: ...safety precautions needed for moving and handling the equipment A crane or forklift and qualified operator are recommended for unloading assembly and installation of the collector Location must be cle...

Page 9: ...rce and switch any two leads on the output side of the fan motor starter 1FU 2FU 3FU 1M 1OL 1T2 1T3 fan motor Disconnect L1 L2 L3 1T1 1L1 1L2 1L3 208 230 460 575 60 3 Motor Starter Wiring Diagram Indu...

Page 10: ...or near the inlet and outlet of the collector 4 Check that all remote controls are properly wired and all service switches are in the OFF position 5 Check that all optional accessories are installed...

Page 11: ...2 Monitor pressure drop across filters Abnormal changes in pressure drop may indicate a change in operating conditions and possibly a fault to be corrected 3 Monitor exhaust 4 Monitor dust disposal Op...

Page 12: ...this is easier when the filter pack is supported with one hand on the bottom side EZ Filter Pack Installation Step 2 Step 1 Steps 1 3 Step 4 loosen wing screws slide to rear 4 Insert banded EZ Filter...

Page 13: ...y under each side of the EZ Filter Pack Push EZ Filter Pack to bottom of cabinet filter frame 8 Important place one hand under center of EZ Filter Pack Holding EZ Filter Pack against bottom of cabinet...

Page 14: ...utomatic filter shaker to clean the filters 3 When the cleaning cycle is complete open the filter access door 4 Reach inside the opening grasp the dust drawer edge and pull the dust drawer out of the...

Page 15: ...pplied Install two 1 8 in NPT male adapters supplied with the gauge into the high and low pressure ports on the side of the gauge 6 Attach the mounting bracket using three 6 32 x 1 4 in screws supplie...

Page 16: ...nting screws mounting bracket static pressure tee 1 8 in NPT x 90 elbow 1 8 in NPT adapter 1 8 in NPT adapter 3 8 in flat washer dirty air plenum pressure tap location 1 8 in NPT adapter 1 8 in NPT x...

Page 17: ...turer s rated amps Electrical circuit overload Check that the power supply circuit has sufficient power to run all equipment Inlet too large for collector rating Contact installer of dust collection e...

Page 18: ...____ Collected Dust __________________________________________________________________________________ Dust Properties Kst________________Pmax_______________ MIE_____________ MEC___________________ Ac...

Page 19: ...regoing warranty on services Products manufactured by a third party Third Party Product may constitute contain be contained in incorporated into attached to or packaged together with the goods Buyer a...

Page 20: ...america Email IndustrialAir donaldson com Phone 52 449 300 2442 South Africa Email SAMarketing donaldson com Phone 27 11 997 6000 Southeast Asia IAF Email IAF SEA donaldson com Phone 65 63117373 Impor...

Reviews: