Installation, Operation and Maintenance manual
36
Downflo
®
Evolution
OPERATION SCHEDULE
To ensure a good performance of your dust collector follow the checkpoints
mentioned below according the timetable.
No.
Checkpoint
Type of control
Measures
day
Weeks
2
4
8
26
1
Control box
Visual check ∆P
See trouble shooting guide
in Control manual
•
2
Dust disposal
system
Check contents of dustbin(s) If ¾ full, empty dustbin
(see section 'Dust
removal’)
•
3
Fan set
Excessive noise
See Troubleshooting guide
•
4
Clean air
chamber
Emission : dust carry over in
clean air chamber
See Troubleshooting guide
•
5
Controls
settings
Check settings of both
potentiometers (pulse time
100 milliseconds, interval
time 10 seconds) on the
control box (see separate
manual)
Interval time normally
to be set at 10 seconds.
Pulse time 100
milliseconds.
•
6
Filter/
regulator
Oil and/or water is in the
reservoir
Switch off and bleed
compressed air prior
servicing. Clean oil
water separator. Check
compressor.
•
7
Solenoid
valves
Noise of escaping air is
produced
See Troubleshooting guide
•
8
Diaphragm
valves
Noise of escaping air is
produced
See Troubleshooting guide
•
9
Doors
Visual check gaskets
Replace gaskets if
necessary
•
10
Connecting
ducts
Check for leakage
Repair if necessary
•
11
Dust collector
and platform
Check damage, strength and
corrosion
Repair or replace if
necessary
•
12
Filter
cartridge
Preventive replacement of all
filter cartridges
Unless otherwise specified in the scope of delivery
every 2 years.
13
Bursting
panel
Periodic visual inspection
Bursting panel to be
replaced if it appears
damaged, corroded or
leaking
•