A4
Provisional Anchor Bolt Recommendations
The quantity of anchor bolts should match the number of holes
provided in the base plates of the collector. Anchor diameter is
typically 1/8-inch less than the baseplate hole diameter. Anchors
should project a minimum of 1 ¾ -inch and account for nut,
washer, baseplate, and shims/grout.
Consider Hilti HIT-HY 200 Anchor Systems or equivalent.
Anchor should project
a minimum of 1 3/4-in
and account for nut,
washer, base plate
and shims/grout.
Embedment depth
(suitable for the
physical properties
of the foundation).
Typical Foundation Anchor
Installation
Electrical installation must be performed by a
Compressed air installation must be performed by
.
This equipment is not designed to support site ducts, piping, or electrical services. All ducts, piping, or electrical
services must be adequately supported to prevent injury and/or property damage.
Collector Connections
1. Complete electrical connections to the collector electrical junction box. The DFEP ships from the factory with the internal
electrical wiring completed for the fan and cleaning controls.
2. Complete connection to a compressed air supply. Installation should include a shut-off valve, and bleed type regulator with
Purge compressed-air lines to remove debris before connecting to the collector.
3.
4.