OPERATION
uary 2008
•
On Jobstart
ting.
x must be
selected.
ariable should be updated.
the offset:
y is Wednesday. Update should be done on Mondays.
e will update th
onday.
is made on a single day can be simulated.
Example:
e 12 Jan 2006
Update
The time can be updated in three ways:
When the label is loaded into the printer memory the actual time when loading
will be stored and this time will be printed at each label when prin
•
Real-time
If the RTC is required to be updated after every print, this bo
activated. Printing speed will not be affected if this option has been
•
Specify Time
D
ay and time can be specified for when the v
This is done by going back to the specified day, and then calculate
Actual da
The variabl
e output as if today was M
This way an entire week’s production that
Actual day:
Monday th
Update Day:
Friday
2006
ut i
2006
… …
Thursday (15
th
) output is:
Friday 9 Jan 2006
Friday (16
th
) output is:
Friday 16 Jan 2006
Friday (9
th
) output is:
Friday 9 Jan
Saturday (10
th
) outp
s:
Friday 9 Jan
(
124
)
27864 Issue 1 Jan
Summary of Contents for V100
Page 1: ...V100 V200 V400 Maintenance Manual Operation and ...
Page 2: ... 2 27864 Issue 1 January 2008 ord Issue 1 January 2008 Amendment Rec ...
Page 4: ... 4 27864 Issue 1 January 2008 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...HEALTH SAFETY THIS PAGE INTENTIONALLY LEFT BLANK 6 27864 Issue 1 January 2008 ...
Page 8: ...HEALTH SAFETY THIS PAGE INTENTIONALLY LEFT BLANK 8 27864 Issue 1 January 2008 ...
Page 70: ...THIS PAGE INTENTIONALLY LEFT BLANK 70 27864 Issue 1 January 2008 ...
Page 274: ...APPENDIX B EASYDESIGN MANUAL 274 27864 Issue 1 January 2008 ...
Page 291: ...APPENDIX B EASYDESIGN MANUAL THIS PAGE INTENTIONALLY LEFT BLANK 27833 Issue 1January 2007 291 ...