EN
Installation
Skyscreen Powered
16
Key to circuit diagrams:
7.2
Frame fitting
A
Proceed as shown (fig.
4
, page 4):
➤
Align the blind with the window cut-out and mark where the holes are to be
drilled for the frame.
➤
Fix the frame with the screws to the ceiling.
I
➤
If necessary, you can remove a panel as shown (fig.
9
, page 7 and fig.
0
,
page 7 for installations without headlining or fig.
a
, page 8 for installations
with headlining).
Item
Description
1
Fused 12 V
g
or 24 V
g
supply
(fuse rating: 2 A for 12 V
g
, 1 A for 24 V
g
)
2
Head rail motor 1
3
Head rail motor 2
4
Customer supplied switch (DPDT (double pole, double throw),
latching or momentary, 12/24 V
g
, 3 A)
5
AP Receiver
6
Automation system dry contact component
7
IRS-300
bk
black
rd
red
wh
white
gy
gray
ye
yellow
NOTICE! Risk of damage
•
Use packing material where required (fig.
3
, page 4). The side tracks must
be perpendicular to the head rail.
•
Use screws and plugs suitable for the wall construction to fix the frame to
the recess. Pre-drill at the marked points.
•
Ensure not to drill through the wall.
NOTE
Check whether the moving rail is square and moves freely. If the moving rail is
not square it can be adjusted as shown (fig.
9
, page 7 to fig.
b
, page 8).
Skyscreen_IOM_EMEA16.book Seite 16 Donnerstag, 19. Dezember 2019 2:04 14