CERTIFIED INSTALLATION
Certified installations require one roof vent and one
lower side vent.
For "
Certified Vent System Kits" see page 15.
For further information contact your dealer or distributor.
METHODS OF INSTALLATION
The method of installation is shown in FIG. 9. It is
essential that all maximum or minimum dimensions are
strictly maintained as the performance of the refrigerator
is dependent on adequate flow of air over the rear of the
refrigerator.
NOTE: The upper vent should be centered over
the condenser at the back of the refrigerator.
VENTILATION HEIGHTS
Installation with roof
Minimum ventilation
vent and lower side vent
heights in
Refrigerator
Inches
mm
RM 7832
65
1651
CLEARANCES
Minimum clearances in inches to combustible materials
are:
G: Top
0
K:
Side
0
L:
Bottom 0
M: Rear
0
N:
See NOTE: Clearance "N" below.
NOTE: Clearance "M" is between the rearmost part of
the refrigerator and the wall behind the refrigerator.
NOTE: Clearance "N" is the distance between the bot-
tom of the lower vent to the roof material. For ventilation
height, see table VENTILATION HEIGHTS
See Figures 9, and 10.
WATER CONNECTION
The water supply system must have a minimum pres-
sure of 15 psig. A water line 1/4 inch in diameter shall
be used to the water valve connection at the rear of the
refrigerator. The water line must have a manual shut off
valve placed where it is easily accessible.
NOTE: A sealant must be applied around the water line
where it enters through the compartment wall.
! ATTENTION
This refrigerator is equipped with a heater for cold
weather, ice maker operation.
The Ice Maker Heater is not functional until the "auto
switch" energizes the heater when ambient temperatures
fall below 32°F.
The heater is fused, max. fuse size 3 amp.
In temperatures below 32°F, check that the ice maker
heater fuse is intact.
Condenser
Ventilation
height
FIG. 9
FIG. 10
N
M
G
K
K
L
NOTE: Wood Strip
MUST be in place
13-5/8"
28-5/8"
LOWER VENT CUTOUT
7
Summary of Contents for RM 7832
Page 2: ......
Page 16: ...MO FO 9848 ...