Interact System Package
7
Installing modem / Modem installieren
When the DCP is removed, these LEDs must be visible (fig. 7):
•
Left: Power LED Interact LTE modem
•
Right: LED Interact gateway
Wenn das DCP entnommen wird, müssen diese LEDs erkennbar sein (Abb. 7):
•
Links: Power LED des Interact LTE Modems
•
Rechts: LED des Interact Gateways
6
7
Summary of Contents for LMC Eriba Nova
Page 3: ...Interact System Package 3 Overview cabinet Übersicht Schrank 1 ...
Page 4: ...Interact System Package 4 Circuit diagram Schaltplan 2 ...
Page 5: ...Interact System Package 5 Installing gateway Gateway installieren 3 4 ...
Page 6: ...Interact System Package 6 Installing gateway Gateway installieren 5 ...
Page 11: ...Interact System Package 11 Installing antenna Antenne installieren a ...
Page 15: ...Interact System Package 15 Connecting control panel Bedienfeld anschließen e ...
Page 21: ...Interact System Package 21 Installing distribution board Verteilerplatine installieren k ...
Page 23: ...Interact System Package 23 Installing type plate Typenschild installieren m ...