11
EN
RTX1000/2000, SPX1200T
Installation
➤
Connect the wiring loom to the unit and fix with a cable tie in a suitable
position (fig.
2.
).
7.9
Installing supply lines to the condenser unit
(SPX1200T only)
Observe the following instructions when installing the supply lines:
•
Also observe the installation instructions for the condenser unit.
•
The maximum cable length between the evaporator and condenser unit is
4.20 m (fig.
).
•
When installing and bending supply lines, avoid narrow radii. Use a suitable
round object as a bending aid. A radius which is too narrow will buckle the
refrigerant line, and the parking cooler will be inoperable.
➤
Shorten any supply line which is not needed by bending a curve.
➤
1) to prevent water entering between the
rear wall of the truck and the clip.
I
➤
Fasten the supply lines to the rear wall of the truck using the clips provided
(fig.
➤
Insert the corrugated piping in the holder provided (fig.
➤
Put the cover on (fig.
7.10
Fixing the cover frame
A
➤
Fix the cover frame in place as illustrated (fig.
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole), you can
also apply the clip using a suitable adhesive. Observe the instructions provided
by the adhesive manufacturer.
NOTICE!
Tighten the screws carefully in order not to damage the cover frame.
RTX1000-2000-SPX1200T-Scania-NG--I-16s.book Seite 11 Montag, 7. Oktober 2019 7:21 19