![Dometic CAL136.302 Manual Download Page 7](http://html.mh-extra.com/html/dometic/cal136-302/cal136-302_manual_2518208007.webp)
B.
LIFT AND PLACE
the unit over the prepared roof
opening. The blunt end of the air conditioner goes
toward the rear of the van. (FIG. 5.B.1)
C. Center the rubber gasket as near as possible over the
opening.
This completes the outside work. Minor adjustments to the
air conditioner position may be done from inside the van.
DO NOT
slide the air conditioner across the roof. The
rubber gasket attached to the bottom of the air conditioner
will not seal properly if damaged or torn by sliding. (FIG.
5.B.2.)
FIG. 5.B.1.
LIFT
AND
PLACE
CENTER ON OPENING
REAR
A.
B.
FIG. 5.B.2
SLIDE
AG
6. UPPER DISCHARGE AIR DUCT
INSTALLATION
(FIG.
6)
The upper discharge air duct is shipped inside the lower
discharge air duct attached to the ceiling template.
Remove the upper duct from the ceiling template duct
and install it over the blower discharge opening.
FIG. 6
NOTE:
The edge without the flange goes toward the
rear of the van.
Secure the duct in place with two of the pointed screws
provided. There are prepunched holes in the base pan
for ease of installation.
SIDE WITHOUT
TAB TO REAR
OF APPLIANCE
7