4
Bolting down:
NB: The maximum length of threaded rod allowable to be screwed into the unit
is 60mm.
The standard rods supplied are 100mm x 5/16” BSW. If the ceiling thickness is such
that more than 60 mm will enter the unit, then the threaded rods must be shortened or
replaced with a shorter type.
Using an overlength rod may damage the evaporator assy within the unit.
Installing the 4 clamp bars: See Figs 6 &7
Firstly engage the 4 threaded rods into the moulded in nuts in the base of the unit. Run
the threaded rods in until there is about 20mm of rods below the ceiling line.
Now take each clamp bar in turn , feed them onto the threaded rod and force the
threaded rod firmly into the corner of the square hole.
Now using the nails provided, affix the clamp bars at 45 degrees across the corners of
the square hole.
THIS IS MOST IMPORTANT.
Ensure that the heavy washers provided are used.
Now start the nuts and tighten each progressively to pull the unit down firmly.
Put on the second nut and lock it against the first to secure the bolts. Fig 6
Fig 6
More information https://www.caravansplus.com.au