Dometic 3241.301 Installation & Operating Instructions Manual Download Page 4

4

 

 

b.  The  roof  must  be  designed  to  support  65 

Kg. when the Caravan is in motion. Normally 

a  100  Kg.  static  load  design  will  meet  this 

requirement.

 

 

c.  Check inside the Caravan for air distribution 

box  obstructions  (i.e.  door  openings,  room 

dividers, curtains, ceiling fixtures, etc.). See 

FIG. 3.

FIG. 4

C.  Roof Preparation

 

1.  Opening requirements - Before preparing the ceil-

ing opening, read all of the following instructions 

before beginning the installation.

 

 

If an existing roof vent opening will not be used 

a 362 mm x 362 mm (± 3 mm) opening must be 

cut through the roof and ceiling of the Caravan. 

This opening must be located between the roof 

reinforcing members.

It is the responsibility of the installer of this 

system to ensure structural integrity of the 

Caravan roof. Never create a low spot on the 

roof where water will collect. Water standing 

around  the  unit  may  leak  into  the  interior 

causing damage to the product and the Cara-

van.

There may be electrical wiring between the 

roof  and  the  ceiling.  Disconnect  220  -  240 

VAC power cord and the positive (+) 12 VDC  

terminal at the supply battery. Failure to follow 

this instruction may create a shock hazard 

causing death or severe personal injury.

FIG. 3

Dimensions Are  Nominal

Dimensions Are  Nominal

70 mm

(overall

 depth)

635 mm

508 mm

Front

76 mm

125 mm

130 mm

76 mm

362 mm x 362 mm

(± 3 mm) Opening

152 mm

139 mm

75 mm

233 mm

 

 

The 362 mm x 362 mm (± 3 mm) opening is part 

of the return air system of the unit and must be 

finished in accordance with all applicable national 

and local codes and/or regulations.

 

2.  Roof vent removal

 

 

a.  Unscrew and remove the roof vent.

 

 

b.  Remove all caulking compound around open-

ing.

 

 

c.  Seal all screw holes and seams where the roof 

gasket will be located. Use a good grade of all 

weather sealant. See FIG. 4

 

 

d.  If the opening exceeds 365 mm x 365 mm, it 

will be necessary to re-size the opening to 362 

mm x 362 mm (± 3 mm).

 

 

e.  If the opening is less than 359 mm x 359 mm, 

it must be enlarged to 362 mm x 362 mm (± 3 

mm).

 

3.  New opening - (Installation other than vent open-

ing)

 

 

a.  Mark a 362 mm x 362 mm (± 3 mm) square 

on the roof and carefully cut the opening.

 

 

b.  Using  the  roof  opening  as  a  guide,  cut  the 

matching hole in the ceiling.

 

 

c.  The opening created must be framed to provide 

adequate support and prevent air from being 

drawn from the roof cavity. Framing stock 19 

mm or more in thickness must be used. Re-

member to provide an entrance hole for power 

supplies at the front of the opening. See FIG. 

5.

Summary of Contents for 3241.301

Page 1: ...THIS UNIT INFORMATION FOR FUTURE REFERENCE Type Number Product Number Serial Number ADB Number ADB Serial Number Date Purchased This manual must be read and understood before installation adjustment s...

Page 2: ...p 3 Powerwhentheunitstartsmustbeabove198VAC and the frequency must be 50 Hz at all times D The ability of the air conditioner to maintain the de sired inside temperature depends on the heat gain of th...

Page 3: ...is unit installa tion 2 The manufacturer will not be liable for any dam ages or injury incurred due to failure in following these instructions 3 The equipment shall be installed in accordance withnati...

Page 4: ...ay create a shock hazard causing death or severe personal injury FIG 3 Dimensions Are Nominal Dimensions Are Nominal 70 mm overall depth 635 mm 508 mm Front 76 mm 125 mm 130 mm 76 mm 362 mm x 362 mm 3...

Page 5: ...placed with type Y attachments if done by qualified personal Thisunitweighsapproximately45Kilograms Topreventbackinjury useamechanicalhoist to place unit on roof Do not slide the unit This may damage...

Page 6: ...pter tabs into the ceiling template See FIG 11 3 Pin Heater Connector If Electric Heat Installed FIG 9 9 Pin Connector Control Box Return Air Opening Discharge Opening Remove Liner From Foam Tape Fron...

Page 7: ...End Of ADB To Ceiling Push Here To Engage Latches Then Remove Labels Auxiliary Screw Locations Auxiliary Screw Locations FIG 15 Install 2 Primary Mount Screw First Strain Relief b Tighten the strain r...

Page 8: ...2 3 minutes before turning on the unit This allows the refrigerant pressures in the unit system to equalize so the com pressor may restart B Cooling Operation Blue Graphic 1 Setthethermostatatthedesi...

Page 9: ...ed heat output and could fully stop fan rotation in extreme condi tions To avoid this the system controls turn off the compressor if out door temperature drops below 5 6 C and returns heating when the...

Page 10: ...10 ROOF MOUNT ASSEMBLY Rear Air Conditioner Heat Pump AC HP Discharge Duct Ceiling Template With Metal Brackets Mounting Bolts Air Distribution Box ADB Roof Opening FIG 19 Duct Adapter Vents Filter s...

Page 11: ...51 5 75 7 127 21 620 02 6 211 725 72 21752 6 02725 20 7 8 67 57 51 75 51 51 6 5 2 7 8 7 3 66 2035 6625 7 31 37 5 203 20 50 3 1 3 1 5 3 7 31 7 7 5 7 51 5 67 57 66 67 127 21 620 02 6 127 21 620 02 6 5 1...

Page 12: ...2 6 67 57 3 353 3 66 75 7 5 25 353 20 50 203 3 31 37 5 25 7 353 1 1 211 725 1 7 31 51 7 7 1 3 6 5 2 2035 6625 5 9 56 1 9 9 7 8 31 8 0 17 7 7 67 7 51 51 8 5 20 51 7 02725 9a 86 233 5 21 8 7256 21 5 1 7...

Reviews: