Opticooler |
Temperature. That Arrives.
Author: M. Thran
Operation Manual Opticooler-TS V1 30_ 2019_05_09.docx09
Page 29 of
44
Version: 1.30
Issued: 09. May 2019
When the transport is finished and the goods are offloaded, the container must be switched
off completely with the main switch. Otherwise, the batteries will discharge and can be
damaged.
Recharge the container as soon as possible after the unloading.
3.3.5. Switch Off
8.
If a program is active, stop the program
(see 3.3.4).
9.
Push the red button left beside the display.
Prior to switching the container off, an active program must be stopped. Otherwise, faults in
the control system may occur which may result in malfunction during transport and loss of
goods.
Fig. 3.31 Control panel with basic screen
!Note!
!!Caution!!