Summary of Contents for L-05
Page 1: ...CONSTRUCTION MANUAL L 05 安装时间 Time to build 6hours 最大载重 Max weight 30Kg ...
Page 8: ...4 M8X20 4 140mm 240mm ...
Page 10: ...6 M8x20 2 ...
Page 11: ...7 M8X40 2 240mm 装配时根据需要选择合适的齿片 Select the appropriate knurled discs 280mm M8x32 2 M8 2 A B 40 ...
Page 12: ...8 M8X20 3 M8 M8X25 A B 418mm 1648mm Ø 22XØ 32XH10 2 Ø 8XØ 30XH2 M8x20 ...
Page 13: ...9 M8X20 2 120mm 120mm 140mm 120 140mm ...
Page 14: ...10 M8X32 2 M8 2 M8X25 75 C M8 X2 M8 M8X32 M8X20 D ...
Page 15: ...M8X20 2 307mm 65mm 11 25 25 ...
Page 16: ...12 M8X32 2 M8 2 20 20 B M8X40 M8X20 57mm 57mm A ...
Page 17: ...重复步骤 一共做 2 套组件 Assemble 2 identical components C B M8X32 4 M8 4 13 A M8X20 2 60mm X2 ...
Page 18: ...14 M8X40 2 M8X50 A B Ø 8XØ 30XH2 Ø 8XØ 16XH1 6 轴承端 Bearing side 80mm ...
Page 19: ...15 M8X20 4 非轴承端 Non Bearing side A M8X25 2 M8 2 B M8x50 1 ...
Page 20: ...B 222mm 16 A M8X20 2 橡胶链条拉紧后再用螺丝 拧紧 Tensioned with full force then tighten bolts well ...
Page 21: ...17 ...
Page 23: ...D M8x20 2 M8 M8x25 ...
Page 26: ...M8X40 3 A 40mm 20 ...
Page 27: ...M8X20 2 A 21 160mm ...
Page 28: ...A M8x20 2 172mm ø8Xø30xh2 2 Ø 19Xø32xh10 22 ...
Page 30: ...1 2 3 24 A M8X60 2 M8 2 B C ...
Page 32: ......