R E SE
T
T E S T
7
PAGE 7
7. INSTALL THE BOTTOM BELT
aligning the belt spindle
with the top one.
8. P
LACE THE THERAPY MODULE
over the wall, the belt
spindles and the seat with the punched hole. When placing the
module, make sure the inside lower edges of the module are kept
away from the liner to prevent tearing it.
9.
FILL UP SPA
and follow the instructions listed in
“Initial Start Up Procedures.”
SEAM
PUNCHED
HOLE
INTAKE
TUBE
8
IMPORTANT: THE SPA WALLS AND
INTERLOCKING PINS HAVE NOT BEEN
DESIGNED TO SUPPORT THE WEIGHT OF THE
WATER OVER EXTENDED PERIODS OF TIME.
THE BANDS MUST BE INSTALLED TO PROVIDE
THE STRUCTURAL AND LOAD SUPPORT TO THE
SPA WALLS. FAILURE TO INSTALL THE BELTS
COULD CAUSE TEARING AT THE WALL HINGES
AND WILL VOID THE WARRANTY.
DO NOT PLUG IN THE THERAPY MODULE
UNTIL THE SPA HAS BEEN FILLED AND
PRIMED PROPERLY.
9