9
Manual No. 4111-0025
March 2011
May 2012
INSTALLATION
INSTALLATION DETAILS
IMPORTANT
DO NOT remove the shipping bands around the
dock leveler lip until instructed to do so.
Post safety warnings and barricade the work area at
dock level and ground level to prevent unauthorized
use of the dock leveler before installation has been
completed.
Failure to follow the installation instructions can
result in damage to dock leveler, the facilities, and/
or serious personal injury or death.
Only trained installation professionals with the
proper equipment should install this product.
50 INCH
PREFERRED