
DLC Australia Pty Ltd
7
www.dlc.com.au
PD030 DIODE LASER MANUAL
3. Pre-Startup Preparations
3.1 Unpacking and inspection
After unpacking, please check to ensure that the instrument is not seriously damaged,
circuit lines are well connected and accessories are available (see accessories list)
3.2 Checking power voltage
Ensure that the power voltage complies with the requirement of the instrument. Socket is
in working order.
3.3 Connecting power cable
Plug the two terminals of the power cable into the power input socket and the power
socket. (Make sure the ground socket is in working order.)
3.4 Footswitch Connection
Plug the footswitch cable into the socket on the rear part of the instrument. Push in
alignment of the notch until a tone is heard which means a successful lockup.