background image

 

24                                                

Radeberger Str. 21; 01900 Großröhrsdorf 

                                         Tel. / Fax. 0049 35952- 429465 /- 429457 
                                         E-Mail

[email protected]

;  www.dks-engineering.de                                                     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for AQUATRACE-IV

Page 1: ...ngineering de www dks engineering de MANUAL AQUATRACE IV TRACE MOISTURE ANALYZERS FOR GASES 0 2000ppmV Portable devices optional with battery Wall mounted device IP65 19 inch Rack up to 4 channels Mea...

Page 2: ...NCTIONS 19 7 1 VIRTUAL NETWORK COMPUTING 19 7 2 ULTRA VNC ON A WINDOWS PC 21 7 3 INDIVIDUAL ADJUSTMENT OF THE CHARACTERISTIC CURVE 22 8 PLUG ASSIGNMENT APPLIES TO EACHS CHANNEL 26 8 1 MEASURING CELL D...

Page 3: ...me dependent course of the measured values for one or all integrated channels 5 The run in process after recoating is represented with logarithmic scaling After falling below the upper measured value...

Page 4: ...way that the acid always absorbs a constant proportion of the gas moisture and this proportion is electrolyzed in the same unit of time The consequence of this is the setting of a dynamic equilibrium...

Page 5: ...ured values over a longer period of time When operating the measuring cell a constant gas flow must always be ensured The flow rate has an influence on the response time after humidity change but also...

Page 6: ...me for the flushing of the measuring device after the initial commissioning and openings e g after service work The measuring cable between the cell and the evaluation device is 2 0 m long as standard...

Page 7: ...ere you can select the desired language The entire operation can then be carried out in this language Configuration menu item Display in ppmV or Dp in C Language selection Nutzerverwaltung Channel man...

Page 8: ...f users with different access authorizations can be created 4 operator levels are provided for these authorizations 0 Free access access without PIN code or dongle 1 Plant personnel PIN for channel sw...

Page 9: ...35952 429465 429457 E Mail info dks engineering de www dks engineering de The recorded measurement data can be read out via the logbook on a USB stick and made available as a date based daily csv fil...

Page 10: ...465 429457 E Mail info dks engineering de www dks engineering de The arrangement of the channel representation can be changed as desired By touching a channel field it appears in the foreground The vi...

Page 11: ...65 429457 E Mail info dks engineering de www dks engineering de Representation of an infeed operation with logarithmic scaling As long as the adjustable limit value is exceeded the display flashes red...

Page 12: ...o dks engineering de www dks engineering de When the visible curve value on the left edge of the image has reached the scaled maximum value the scaling switches back to linear division A sensor test i...

Page 13: ...fo dks engineering de www dks engineering de For the sensor test the input of the PIN engineer or operator level required see menu item Users if this is specified After confirming with Enter you will...

Page 14: ...ks engineering de www dks engineering de When the test is started it runs automatically and the time course can be tracked In the meantime the analog output is switched to sample and hold The test res...

Page 15: ...to the coating mode yes or to measure further no In this case the service icon remains active If confirmed with yes the operator receives an indication of possible dangers At the same time the voltage...

Page 16: ...s engineering de www dks engineering de If the cleaning was not successful i e the electric zero point has not been reached the process must be repeated If the cleaning result is positive 0 1 ppm the...

Page 17: ...in the display in logarithmic representation The relay Maintenance is only deactivated after falling below the limit and releases the analog output again sample and hold is switched off If basic maint...

Page 18: ...ring de www dks engineering de If the maintenance has been confirmed with yes for the selected channel the icon for this channel appears on the display for the duration of the maintenance After comple...

Page 19: ...via this interface 1 Modbus TCP direct up to date data transfer from PLS 2 Remote control of an AQUATRACE IV device via VNC 3 FTP File Transfer VNC implements the Remote Framebuffer Protocol and is pl...

Page 20: ...20 Radeberger Str 21 01900 Gro r hrsdorf Tel Fax 0049 35952 429465 429457 E Mail info dks engineering de www dks engineering de Next please navigate to the digital output...

Page 21: ...your wishes To complete the configuration please press close configuration The software is restarted and the IP address is adopted A VNC connection to the Aquatrace IV is then possible 7 2 Ultra VNC...

Page 22: ...ntry The image of the device display now appears on your PC 7 3 Individual adjustment of the characteristic curve The following options are available 1 Programming of a separate plant specific charact...

Page 23: ...23 Radeberger Str 21 01900 Gro r hrsdorf Tel Fax 0049 35952 429465 429457 E Mail info dks engineering de www dks engineering de The following pictures are intended to illustrate this possibility...

Page 24: ...24 Radeberger Str 21 01900 Gro r hrsdorf Tel Fax 0049 35952 429465 429457 E Mail info dks engineering de www dks engineering de...

Page 25: ...25 Radeberger Str 21 01900 Gro r hrsdorf Tel Fax 0049 35952 429465 429457 E Mail info dks engineering de www dks engineering de...

Page 26: ...lug 09 0317 00 05 1 Measuring Voltage Output 2 Measuring Voltage Input 3 Sensor ID 100 Nl h 4 GND 5 Sensor ID 20 Nl h Measuring cell connection via cable with miniature coupling plug angled binder ser...

Page 27: ...ee COM 5 Relay 2 NO NO 6 Relay 2 NC NC 8 4 Relay outputs 3 4 Type of device socket Binder Series 680 6 pin cable plug 09 0321 00 06 Relay 3 for C Check Channel in Maintenance Relay 4 for M maintenance...

Page 28: ...the sensor responds immediately 1 sec Here too the visualization of the measured values as a curve curve on our touchscreen is of particular importance 10 2 How does the sensor behave in case of wet d...

Page 29: ...1 Analog output see 8 2 Relay outputs see 8 3 Relay outputs see 8 4 USB Connection for updates or Copy of the recorded log Data USB Connection for Updates or Copy of the recorded log Data Start Stop s...

Page 30: ...www dks engineering de USB Connection for Updates or Copy of the recorded log Data Start Stop switch to start min Press 3s green ring glows ok Ethernet Socket Power switch and Mains connection Measuri...

Page 31: ...o moist T90 5 sec Wet after dry T90 15 min Repeatability 0 1 ppmV optional 0 02 ppmV Calibration traceable calibration certificate n point calibration adjustment optional Display Touchscreen 800x480 p...

Page 32: ...der 100 En h Gas temperature 5 90 C Gas pressure approx 200 mbar at the measuring cell inlet flowing out without pressure Gas connectors for 1 4 NPT screwdriver Electrical connector cell 5 pol Binder...

Reviews: