background image

User Manual

NiMH Battery Module

Installation and

Operation Instructions

Part Number 2767

Therapy System

Moving 
Rehabilitation 
Forward™

DJO is an ISO 13485 Certified Company

Summary of Contents for Chattanooga Intelect Advanced Series

Page 1: ...User Manual NiMH Battery Module Installation and Operation Instructions Part Number 2767 Therapy System Moving Rehabilitation Forward DJO is an ISO 13485 Certified Company ...

Page 2: ...on without express written consent from DJO LLC is strictly prohibited This publication was written illustrated and prepared for distribution by DJO LLC Foreword 1 Battery Module 2 3 Precautionary Instructions 2 3 Nomenclature Specifications 4 6 Battery Module Installation 7 10 Battery Module Removal 11 12 Battery Operation 13 14 Maintenance 15 Warranty 16 ...

Page 3: ...these specifications may be made at any time without obligation on the part of the DJO LLC Before administering any treatment to a patient the users of this equipment should read understand and follow the information contained in this and the system user manual for each mode of treatment available as well as the indications contraindications warnings and precautions Consult other resources for add...

Page 4: ...ds associated with using any battery powered electrical stimulation or ultrasound device Observe the precautionary and operational decals placed on the unit DO NOT operate the Intelect Advanced Therapy System when connected to any unit other than DJO LLC devices DO NOT operate the unit in an environment of short wave diathermy use The Intelect Advanced Battery Module should be operated transported...

Page 5: ...dures Equipment not suitable for use in the presence of a flammable anesthetic mixture with air with oxygen or nitrous oxide NiMH batteries contain Class E corrosive materials In the event of battery cell rupture or leakage handle battery module wearing neoprene or natural rubber gloves Contents of a ruptured or leaking battery can cause respiratory irritation Hypersensitivity to nickel can cause ...

Page 6: ... the System or the Channel 3 4 Electrotherapy Module if equipped This allows the System to have the potential of sEMG and sEMG Electrical Stimulation available on two channels 1 and 2 or 3 and 4 The Vectra Genisys Therapy System is equipped with a factory installed sEMG Module NOTE The sEMG Module cannot be installed onto the Battery Module It can only be installed onto the Two 2 Channel System or...

Page 7: ...ry software inherent in the system Also with the Battery Module installed an sEMG Module may be added to the System making the Intelect Advanced Therapy System capable of battery powered sEMG and sEMG Electrical Stimulation The Battery Module comes equipped with all necessary hardware and standard accessories required for complete installation and use The only tools required for installation is a ...

Page 8: ...Output 24V Electrical Class CLASS I Intelect Advanced Battery Module NOMENCLATURE SPECIFICATIONS Specifications WIDTH DEPTH HEIGHT 1 Battery Module 2 Extended Front Access Panel 3 Module to System Mounting Holes 4 Module to System Feet Alignment Indents 5 Power Cord Routing area 6 Module to System Ribbon Cable 1 2 3 4 6 5 Nomenclature ...

Page 9: ...th an sEMG module leave it in place to maintain sEMG functions for Channels 1 and 2 The sEMG mod ule will not interfere with installa tion of the Battery Module to the system DISCONNECT POWER CORD REAR PANEL 4 Remove the Front Access Panel and disconnect all existing cables and Lead Wires 5 Using the 1 Phillips Screwdriver remove the screw securing the Lanyard to the Front Access Panel NOTE Store ...

Page 10: ...the Ribbon Cable connected to the module to ensure it is completely seated on the connector SEAT RIBBON CABLE ON MODULE 2 Install the loose end of the Ribbon Cable to the System Make certain connector is seated completely in System Make certain ribbon cable remains flat not twisted when the system and the module are mounted together If Ribbon Cable is twisted the pins will not properly align If po...

Page 11: ...de 6 Secure the Module to the System with the four 4mm X 20mm screws using the 1 Phillips screwdriver NOTE Tighten screws until System will not move on the Module 9 Route the power cord through the Battery Module to the System NOTE If the System is equipped with the optional Therapy System Cart refer to the Intelect Therapy System Cart User Manual for proper installation of the System with Module ...

Page 12: ...he instructions on the screen WARNING Verify that the module installed is the module displayed in the message BEFORE pressing the START button If it is not DO NOT press the START button Turn the system OFF and back ON If the problem persists call the selling dealer or DJO LLC Technical Support immediately DO NOT USE THE SYSTEM until all necessary repairs are made by a Technician certified by DJO L...

Page 13: ...tem 4 Remove the Front Access Panel and disconnect all cables and lead wires 5 Lift the system from the cart if equipped and place upside down on a level working surface with a clean cloth or cushion under the display lens to prevent damage or scratches 6 Remove the four mounting screws from the Module securing it to the system using a 1 Phillips Screwdriver 7 Carefully lift the Module up and disc...

Page 14: ...nd carefully follow the instructions on the screen Verify that no module is installed in the message BEFORE pressing the START button If it is not DO NOT press the START button Turn the system OFF and back ON If the problem persists call the selling dealer or DJO LLC Technical Support immediately DO NOT USETHE SYSTEM until all necessary repairs are made by a Technician certified by DJO LLC If use ...

Page 15: ...battery performance deterioration Charging efficiency of the battery module drops at temperatures above 40 C 104 F and can disrupt full charging lead to deterioration in performance and battery cell leakage Reverse Charging Never attempt reverse charging Charging with polarity reversed can cause a reversal in battery polarity creating gas pressure inside the battery which can activate the safety v...

Page 16: ...lations Storage of Battery Module Short Term Storage The Intelect Advanced Battery Module should be operated transported and stored in temperatures between 15 C and 40 C 59 F and 104 F with Relative Humidity ranging from 30 60 Long Term Storage For long term storage of the Intelect Advanced Battery Module remove the battery module from the system and store in temperatures between 15 C and 40 C 59 ...

Page 17: ... the System Factory Service When the Intelect Advanced Battery Module requires factory service contact the selling dealer or DJO LLC Service Department All units returned to the factory for service must include the following WARRANTY REPAIR OUT OF WARRANTY REPAIR 1 Written statement containing the following information RGA Number Obtain from Factory Unit Model Number Unit Serial Number Contact per...

Page 18: ...dealer or a certified Company service technician Any malfunction or failure in the Product caused by product misuse including but not limited to the failure to provide reasonable and required maintenance or any use that is inconsistent with the Product User s Manual COMPANY SHALL NOT BE LIABLE IN ANY EVENT FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES Some states do not allow the exclusion or limitation...

Page 19: ...485 Certified Company DJO France SAS Centre Europeen de Fret 3 rue de Bethar 64990 Mouguerre France T 33 0 5 59 52 86 90 F 33 0 5 59 52 86 91 djoglobal eu fr_FR 2011 DJO LLC All rights reserved 27455_H Battery English ...

Reviews: