background image

Field of View GeoSnap PPK Manual                                                                                                                         16 

SYSTEM OPERATION 

POWERING THE GEOSNAP PPK SYSTEM 

Battery Information 

Two Turnigy 9XR 2200mAh 11.1V Li-Po batteries are included for powering the system. These batteries have built-
in undervoltage protection, which means that power will be cut from the output leads if any cell drops below 3.0V 
(thus preventing damage to the battery). The advantage of using these batteries to power the GeoSnap PPK (as 
opposed to using power from the drone) is that the GeoSnap PPK can keep logging and maintain GPS lock, even if 
the 

drone’s

 batteries needs to be swapped when mapping large areas.  

Checking Battery Voltage 

You can check the voltage of the entire battery and 

it’s

 individual cells by plugging 

in the battery’s balance plug 

into 

the connector labeled “3 Cells” on 

the included DC-4S charger/voltage checker (you can even do this while the 

battery is powering the GeoSnap PPK). 

A full battery has a total voltage of 12.4V - 12.6V. The battery is practically depleted once has reached 10V. A fully 
charged battery can run the GeoSnap PPK for about 6 hours. 

Battery Charging 

1)

 

Plug in the AC adapter into the wall. 

2)

 

Plug in the barrel power plug from the AC adapter into the DC-4S charger/voltage checker. Check to make 
sure that 3 dashes are displayed before plugging in the battery (this indicates that there is indeed power 
getting to the charger 

and that it won’t just operate as a voltage checker

). 

 

 

 

3)

 

Insert the balance plug of the ba

ttery into the connector labeled “3 Cells”. The charger will display the 

overall voltage battery and the voltage of each cell as it charges. Charging a fully depleted battery takes 
about 2 hours and 30 minutes.  

 

 

4)

 

Once the battery is fully charged, the ch

arger will display “FUL” and begin to beep. At this point you 

should disconnect the battery and unplug the AC adapter from the wall. 

Summary of Contents for Matrice M210

Page 1: ...d is meant to be referenced in conjunction with the GeoSnap PPK Manual https fieldofviewllc com downloads If something is not mentioned in this guide then it is most likely discussed in the manual If...

Page 2: ...tallation 3 What s in the Box 3 Installation Procedure 6 System operation 16 Powering the GeoSnap PPK System 16 Battery Information 16 Checking Battery Voltage 16 Battery Charging 16 Purchasing Additi...

Page 3: ...ON WHAT S IN THE BOX GeoSnap PPK and antenna installed on the DJI M210 mount Lower mount bracket for M210 Survey pole mount bracket 16 GB microSD card and microSD card adapter the microSD card will be...

Page 4: ...mera trigger cable version provided will depend on version ordered Hotshoe module for DSLR style cameras not included for other camera options GeoSnap to hotshoe cable version provided will depend on...

Page 5: ...Test plug use this if you want record events without a camera connected Cable routing clips 4 Ziptie 1 Li Po batteries 2 batteries total included DC 4S charger voltage checker AC charging cable inclu...

Page 6: ...using a MicaSense camera you can skip steps 2 3 6 7 8 and 9 If you are using a MicaSense camera please reference the integration guide specific to your camera found at www fieldofviewllc com geosnap p...

Page 7: ...Field of View GeoSnap PPK Manual 7 2 Install the Micasense DLS 2 on the mount provided by Field of View 3 Install the DLS2 mount on the GeoSnap PPK plate DSL2 cable connector...

Page 8: ...Field of View GeoSnap PPK Manual 8 4 Secure the GeoSnap PPK lower mounting bracket using the 4 screws and included hex key to the top of the drone...

Page 9: ...bracket You must first insert the tab of the GeoSnap PPK into the front receptacle on the lower mounting bracket Then press down and turn the two quarter turn studs clockwise until a click is felt to...

Page 10: ...the GeoSnap PPK to MicaSense RedEdge MX cable 7 Use the provided ziptie and adhesive ziptie mount to organize and secure the DLS 2 ribbon cable to the camera 8 Plug in the last two connectors of the...

Page 11: ...Field of View GeoSnap PPK Manual 11...

Page 12: ...Field of View GeoSnap PPK Manual 12 9 Install the Micasense RedEdge MX in the M210 Skyport as shown the cable lengths are optimized for use in gimbal slot II...

Page 13: ...e location shown and route the DLS 2 ribbon cable through it 11 Next route the GeoSnap PPK to Micasense cable through the same cable clip and use zipties to secure the two cables just below and just a...

Page 14: ...Field of View GeoSnap PPK Manual 14 12 Plug the DLS 2 ribbon cable into the DLS 2 and the GeoSnap PPK to Micasense RedEdge MX cable into the 6 pin connector from the side of the GeoSnap PPK...

Page 15: ...Field of View GeoSnap PPK Manual 15 13 When you re ready to fly plug in the red battery power connector on the GeoSnap PPK...

Page 16: ...er voltage checker you can even do this while the battery is powering the GeoSnap PPK A full battery has a total voltage of 12 4V 12 6V The battery is practically depleted once has reached 10V A fully...

Page 17: ...ectly via the links below Battery https hobbyking com en_us turnigy 9xr safety protected 2200mah 3s 1 5c transmitter pack html DC 4S charger voltage checker https hobbyking com en_us hobbykingr dc 4s...

Page 18: ...the antenna to the skyports of the M210 when using the GeoSnap PPK with M210 integration kit Bottom center of SKYPORT II to antenna L1 phase center offset X offset 0 034 meters Y offset 0 127 meters Z...

Page 19: ...nting Style Quarter turn quick release Battery included 3 cell 2 2 Ah Li Po Battery life 2 6 hours 1 Includes antenna control module hotshoe module M210 mounting hardware battery and cabling 2 Depende...

Page 20: ...Field of View GeoSnap PPK Manual 20 All dimensions are in millimeters...

Reviews: