diversey CO350.5 Manual Download Page 5

45

I25

I24

I23

I22

I21

I20

tr

sv

pt

pl

no

it

fr

fi

es

en

de

da

cz

cn

Preparation for operation

Batteries

Safety measures when working with batteries:

Battery connection diagram

Charging procedure (traction block batteries with integrated charging 
unit)

After completing the charging and with immediate use:

Charging procedure (traction block batteries with external charging unit)

Attaching tools

Check: 
• that the brushes are not below the red marking and that the bristle length is 

no less than 1 cm.

Caution:

Only maintenence-free gel traction block batteries may be used!
Please follow the instructions of use for your battery charger!

• Protective goggles must be worn when working on the 

batteries.

• Do not subject batteries to an open flame or heat as there is a 

danger of explosion from the electolytic gas present in the 
cells!

• No smoking!

• Danger of chemical burns!

Caution:

The battery must always be clean and dry. Do not place any 
metallic objects on the battery.

The integrated charging unit is only suitable for maintenance-free 
gel traction block batteries.

Caution:

Batteries may only be installed or dismounted by customer 
service personnel or specialists approved by Diversey who are 
aware of all the safety regulations that apply here!

50A

Charger

BMS

DP
DV

Control

Dashboard

BM

2

6
5
4
3

2
1

SM

• Stand the machine on the parking support 

before starting the charging procedure.

• Disconnect the battery from the machine using the battery disconnection 

socket.

• Plug the power supply cord into the mains socket.

• The yellow indicator lights up permanently until 

approx. 90% of the battery capacity has been 
reached. After that, the indicator blinks until the 
battery is fully charged.

• When the charging process is complete, the 

green indicator lights up.

In order to protect the battery, the charging sequence is not 
started after a short period of use of less than approx.15 minutes, 
and the green lamp lights up immediately. 
In this case, the battery is charged to more than 75%.

• Leave the power supply cord connected to the mains until you use the 

machine again. The on-board charger unit automatically monitors and 
charges the batteries. The energy consumption in the mode is limited to a 
few milliwatts.

• If a fault occurs during the charging process as the result of a defect in the 

charging unit, an interruption of a cable or a defective battery cell, the red 
indicator will light up.

• Unplug the connection to the mains socket.
• Connect the battery to the machine with the battery disconnection socket.

• Check that the machine is switched off.
• Disconnect the battery from the machine using the battery disconnection 

socket.

• Connect the battery disconnection socket to the external battery charging 

unit (pay attention to the voltage from the mains supply socket).

Caution:

Follow the instructions of use for your battery charger!

• Switch the machine off.

Working with worn out, damaged and or wrong tools, could result 
in possible damage to floors or their protective layers.

• Place the machine on the parking support.

• Remove the brush holder (2) by screwing off the 

triangular handle (1).

• Insert the brush into the brush housing.
• You can push the brush upwards with your right 

hand so that it will be taken up by the centring 
hexagon in the brush housing.

2

1

Summary of Contents for CO350.5

Page 1: ...swingo 350B V006 12089 70 1137 I25 I24 I23 I22 I21 I20 tr sv pt pl no it fr fi es en de da cz cn 12089 70...

Page 2: ...use this machine in rooms in which explosive and easily inflammable materials such as petrol solvents fuel oil dusts etc are stored or processed The electrical or mechanical components could lead to t...

Page 3: ...ecember 2004 for the harmonisation of the legal regulations of the Member States regarding electro magnetic compatibility and for the annulment of Directive 89 336 EEC Harmonised standards applied EN...

Page 4: ...ne for the electronic lines for the controller 21 Solution tank 22 Holder for the battery charger cable 23 Battery disconnection socket 24 Parking support 25 Locking handle for squeegee 26 Deflection...

Page 5: ...low indicator lights up permanently until approx 90 of the battery capacity has been reached After that the indicator blinks until the battery is fully charged When the charging process is complete th...

Page 6: ...0 5 50ml to 10l water 10l 50ml 0 5l Add the product measured with the dosing cup to the water in the solution tank The TASKI J Flex dosing system or the QFM dosing station can also be used for simplif...

Page 7: ...ase of malfunction see page 50 LED blinks red 2 minutes to conclude the work before the machine switches off automatically LED permanently red Requires a complete charging cycle Pull on the adjusting...

Page 8: ...e hole by pressing it down Ensure that the lid locks into place 1 2 3 Switch the machine off 1 Rinse out the tank well with water only Fill the solution tank with water Push the machine to the floor d...

Page 9: ...ion This will prevent any blockage of the suction hose Switch the machine off Stand the machine on the parking support Open the tank lid Remove the recovery tank 2 1 Remove the hoses from the cover Re...

Page 10: ...napper lugs 2 latch in correctly Caution Danger of injury from clamping the fingers 2 1 2 1 3 Switch the machine off The yellow suction filter can be easily removed quick fit seal Clean it with water...

Page 11: ...s Pull the height adjustment lever and fold the guide pillar towards the front Let go of the height adjustment lever the guide pillar will locate into place and stay at that angle To lift the machine...

Reviews: