![Dive Gear Express XTRA Second Stage Service Manual Download Page 17](http://html1.mh-extra.com/html/dive-gear-express/xtra-second-stage/xtra-second-stage_service-manual_2510479017.webp)
6. Second Stage Assembly
(1) Before starting the assembly of the second stage, complete a thorough inspection of all parts to be re
used. Refer to the Overview Inspection section for details. At this time, open the service kit and lay out the
parts. Use the schematic to identify each part.
(2) Using the method described in the Overview, prepare to lubricate the dynamic orings. Remember to not
use excessive amounts of lubrication.
1. Locate the orings for the following assemblies: Orings (31 and 33) for the Adjusting Spring (34). Lubricate
them and install them on the Adjusting Spring. Place Oring (16) on the Orifice (15). Install Orings (26) on the
Shuttle Valve (25). Install Oring (29) on the Adjusting Screw (30). At this time, the LP Seat (24) can be placed
into the end of the Shuttle Valve (25). Fig. 18.
Fig. 18
2. Install Oring (22) on the Valve Spindle (19) after lubricating it. Install Oring (23) in the interior groove of
Valve Spindle on the side shown in Fig. 19.
Fig. 19