Commissioning
ENG
The LED will light up in green after a successful teach-in
process. The process must be repeated if the LED lights
up in red.
7. Follow the directions of the DITECH Smart Home iL app.
5.2 Installation
The alarm siren must be mounted to a wall or a ceiling, or to a
flush-type box.
5.2.1 Installation to wall or ceiling
WARNING
Personal injury by electric shock!
If a live wire is damaged during drilling work, there is dan-
ger of electric shock.
¾
Inspect the installation place for wires prior to drilling.
¾
Ensure that no wires are hidden behind the spot to be drilled.
¾
Change the place of installation if necessary.
Ö
The commissioning has been performed.
1. Select a suitable installation position.
2. Ensure that no lines are laid at this position.
3. Mark the drilling holes (G) using the mounting plate as a
template (see fig 4 page 3).
4. For stone walls, drill the marked holes with a suitable drill.
If wooden walls are present, the screws can be directly
screwed into the wood. Pre-drilling with a 1.5 mm wood
drill facilitates the screw installation.
5. Insert the dowels into the bores.
6. Install the wall-mount support with the supplied screws.
7. Position the alarm siren onto the mounting plate and rotate
to fix it (see fig 3 page 3).
5.2.2 Installation on flush-type box
The alarm siren can be installed to flush-type or junction boxes
using the mounting plate.
WARNING
Personal injury by electric shock!
Danger of electric shock due to possible stripped conductor
ends in the flush-type box.
¾
Installation only to flush-type boxes without stripped conduc-
tor ends.
¾
Modifications and works at the building installation system or
to the low voltage distribution system may only be performed
by an authorised specialist.
¾
Change the place of installation if necessary.