SK750/SK755 Operator’s Manual
Transport - 46
Haul
CMW
Unload
1.
Prepare trailer and ramps for unloading.
2.
Remove tiedowns.
3.
Disengage parking brake.
4.
Start engine.
5.
Pull lift arm control to raise mount plate (and attachment) off ground, but keep it low.
6.
Adjust throttle to low speed and slowly back unit down trailer or ramps.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Attach trailer to vehicle before loading or unloading.
•
Only operate unit from operator platform.
•
If unloading from tilt-bed trailer, be prepared for trailer to tilt.
Summary of Contents for SK750
Page 1: ...SK750 SK755 Operator s Manual 053 2570 Issue 1 0 Original Translation CMW...
Page 11: ...Contents 11 SK750 SK755 Operator s Manual CMW...
Page 21: ...Safety 21 SK750 SK755 Operator s Manual Emergency Procedures CMW...
Page 49: ...Transport 49 SK750 SK755 Operator s Manual Tow CMW...
Page 73: ...Service 73 SK750 SK755 Operator s Manual As Needed CMW...
Page 80: ......
Page 81: ......
Page 83: ...CMW Service Record 83 SK750 SK755 Operator s Manual Service Performed Date Hours...