Prepare - 31
SK750/SK755 Operator’s Manual
Gather Information
CMW
Gather Information
A successful job begins before you start working. The first step in planning is reviewing information already
available about the job and jobsite.
All Jobs
Review Job Plan
Review blueprints or other plans. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Ground-Penetrating Jobs
Notify One-Call Services
Contact your local One-Call (811 in USA) or the One-Call referral number (888-258-0808 in USA and
Canada) to have underground utilities located before digging. Also contact any utilities that do not
participate in the One-Call service.
Above-Ground Jobs
Locate Overhead Lines
Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load
will not touch lines.
Summary of Contents for SK750
Page 1: ...SK750 SK755 Operator s Manual 053 2570 Issue 1 0 Original Translation CMW...
Page 11: ...Contents 11 SK750 SK755 Operator s Manual CMW...
Page 21: ...Safety 21 SK750 SK755 Operator s Manual Emergency Procedures CMW...
Page 49: ...Transport 49 SK750 SK755 Operator s Manual Tow CMW...
Page 73: ...Service 73 SK750 SK755 Operator s Manual As Needed CMW...
Page 80: ......
Page 81: ......
Page 83: ...CMW Service Record 83 SK750 SK755 Operator s Manual Service Performed Date Hours...