RT80Q Operator’s Manual
Service - 161
100 Hour
Test Plow Connector Pivots
Test upper and lower connector pivots every 100
hours.
To test upper pivot:
1. Lower plow to ground.
2. Use plow lift control to put hydraulic load on
pivot joints. Do not raise plow.
3. As hydraulic load is applied and released,
visually check joints for motion. If motion is
observed, contact your Ditch Witch dealer.
To test lower pivot:
1. Lower plow to ground.
2. Use hydraulic jack to place load on lower arm.
3. As hydraulic load is applied and released, visually check joints for motion. If motion is observed,
contact your Ditch Witch dealer.
IMPORTANT:
Lower plow blade to ground and visually inspect bushings and joints. Replace bushings if
there is excessive motion.
t33om028w.eps
Summary of Contents for RT80Q
Page 1: ...RT80Q Tier 4 Operator s Manual 053 2708 Issue 2 0 ORIGINAL INSTRUCTION...
Page 7: ...Overview 6 RT80Q Operator s Manual About This Manual...
Page 67: ...Operation Overview 66 RT80Q Operator s Manual...
Page 91: ...Transport 90 RT80Q Operator s Manual...
Page 92: ...RT80Q Operator s Manual Trench 91 Trench Chapter Contents Set Up 92 Operate 94...
Page 98: ...RT80Q Operator s Manual Plow 97 Plow Chapter Contents Set Up 98 Operate 101...
Page 105: ...Plow 104 RT80Q Operator s Manual...
Page 106: ...RT80Q Operator s Manual Reel Carrier 105 Reel Carrier Chapter Contents Set Up 106 Operate 107...
Page 109: ...Reel Carrier 108 RT80Q Operator s Manual...
Page 114: ...RT80Q Operator s Manual Backhoe 113 Backhoe Chapter Contents Set Up 114 Operate 115 Stow 116...
Page 137: ...Systems and Equipment 136 RT80Q Operator s Manual Counterweighting...
Page 183: ...Service 182 RT80Q Operator s Manual As Needed...
Page 201: ...Specifications 200 RT80Q Operator s Manual RC80 Reel Carrier...
Page 204: ......
Page 205: ......
Page 206: ...RT80Q Operator s Manual Service Record 205 Service Record Service Performed Date Hours...
Page 207: ...Service Record 206 RT80Q Operator s Manual Service Performed Date Hours...