JT520 Operator’s Manual
Prepare - 55
Prepare Jobsite
CMW
Prepare Jobsite
Mark Bore Path
Mark your planned bore path and all located utility lines with flags or paint.
Prepare Entry Point
For bore to be successful, first pipe must be straight as
it enters the ground.
To help ensure that the first pipe does not bend, dig a
small starting hole so that the first pipe is drilled into a
vertical surface.
To prevent bending or straining pipe, position drilling
unit for straight entry.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
•
If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
Summary of Contents for JT520
Page 1: ...JT520 Issue 1 1 Operator s Manual CMW 053 1219...
Page 59: ...Prepare 58 JT520 Operator s Manual Check Supplies and Prepare Equipment CMW...
Page 63: ...Drive 62 JT520 Operator s Manual Shut Down Unit CMW...
Page 71: ...Transport 70 JT520 Operator s Manual Tow CMW...
Page 113: ...Systems and Equipment 112 JT520 Operator s Manual Drill Pipe CMW...
Page 117: ...Complete the Job 116 JT520 Operator s Manual Stow Tools CMW...
Page 141: ...Service 140 JT520 Operator s Manual As Needed CMW...
Page 145: ...Specifications 144 JT520 Operator s Manual CMW...
Page 148: ......
Page 149: ......
Page 150: ...JT520 Operator s Manual Service Record 149 CMW Service Record Service Performed Date Hours...
Page 151: ...CMW Service Record 150 JT520 Operator s Manual Service Performed Date Hours...