DiscountRamps NDALR Quick Start Manual Download Page 3

 

 

 

 

Part 2 

Fig 3 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part 2 

The purpose of part two is to secure the base and frame to the truck bed of your truck. Follow 
the instructions below: 

1.

 

To secure the frame you will need 2 “Stop Bolt”, 2 “16-U Bolts”, 2 “16 Spring Washer, 2 
“M16 Nut”

 

, and 4 “M12X185 Socket Head Screw Bolt”

 

2.

 

Part 2 will secure the top and bottom half of the post. The first part will secure the top 
half. To do this, take a “Stop Bolt”

 

and place it under the lip of your truck bed, putting it 

through the hole on the frame. 

3.

 

Take a “16-U Bolts”

 

and slide it onto the exposed post of the “Stop Bolt”

 

so that the 

tabs run parallel with the post. Then slide on a “16 Spring Washer”

 

and tighten the 

“M16 Nut”

 

until it is secured. 

4.

 

Repeat the process for the additional frame. 

5.

 

To secure the bottom base of the frame you will insert a “M12X185 Socket Head Screw 
Bolt”

 

into both sides of the bases, and then tighten the “M12X185 Socket Head Screw 

Bolt”. Repeat this process for the additional posts. 

 

 

 

Stop bolt 2x 

16-U bolt 2x 

16 spring washer 2x 

M16 nut 2x 

M12X185 Socket head screw bolt 4x 

Summary of Contents for NDALR

Page 1: ...NDALR 250lbs Aluminum Truck Rack Fig 1...

Page 2: ...place a Base near the front and in the back corners of the bed of the truck Note that the Base should be running parallel to each other on the long side of the truck Additionally the long side of the...

Page 3: ...e lip of your truck bed putting it through the hole on the frame 3 Take a 16 U Bolts and slide it onto the exposed post of the Stop Bolt so that the tabs run parallel with the post Then slide on a 16...

Page 4: ...t 2 On the bottom half of each of the bases there is a long slit To secure the frames height take a M12 75 Hexagon Bolt and insert a 12 U Bolt into the M12 75 Hexagon Bolt then slide them into the sli...

Page 5: ...ding the Parallel Support Frame parallel with hole on the post and inserting the bolt Tighten the M12 Lock Nut enough to attach Ladder Stop so that the frame will not fall 3 Repeat the previous step o...

Page 6: ...Part 5 Fig 6 Part 5 Insert the Extended Arm into the Parallel Supporting Frame and secure it with a M12 30 Hexagon Bolt Extended arm 2x M12 30 hexagon bolt 2x...

Page 7: ...art 6 Fig7 Part 6 Screw Tie Down Ring with M6 Washer and M6 Lock Nut to Frame Square and level all components and then tighten all hardware securely Tie Down Ring 2x M6 locknut 2x Frame 2x M6 Washer 4...

Page 8: ...Explosion diagram and parts list Fig 8 Parts List Item Description Quantity 1 Frame 2 2 Base 2 3 Supporting Arm 2 4 Extended Arm 2 5 Parallel Support Frame 2...

Page 9: ...2 J 16 U Bolt 2 B Stop Bolt 2 K M12 30 Hexagon Bolt 2 C 12 U Bolt 4 L M12 Locknut 6 D M12 Nut 2 M M12 flat washer 1 E M12 Spring Washer 2 N Ladder Stop 1 F M12X185 Socket Head Screw Bolt 4 O Tie Down...

Reviews: