background image

P a g e

 | 

 

 

DSE1276LY Rev 3/21 

9) 

Mount the sub-

boom (3/4” thick wall aluminum square tubing) to the sub-boom brackets 

and boom to mast plate using 8-

32 x 1 ¼” screws, lock washers and nuts. NOTE: Do not 

tighten any of this hardware until sub-boom assembly is complete.

 

 
 

 

DO NOT, UNDER ANY CIRCUMSTANCES, APPLY ANY TYPE OF SEALANT OR COATING TO THE 
DRIVEN ELEMENT, T-ARMS OR CONNECTOR ASSEMBLY, OTHER THAN KRYLON

® 

CLEAR COAT. ANY OTHER COATING WILL ADVERSELY AFFECT THE SWR AND VOID YOUR 
WARRANTY. 

 

 

 

Directive Systems Warranty Policy 

 

All Directive Systems antennas are built with the finest materials available. We take great pride 

in building a quality product that will give years of good service and performance. If there is a defect 

in materials or workmanship within 90 days of purchase, Directive Systems will repair or replace 

the defective part, free of charge, to the original purchaser. 

DO NOT RETURN ANYTHING 

WITHOUT PRIOR AUTHORIZATION FROM DIRECTIVE SYSTEMS

. Please contact us either by 

phone or email describing the problem and we will work to resolve it.  

 

If, after examining a new antenna you received, you are not satisfied, contact us immediately 

for return authorization and refund. 

ANY ANTENNA THAT HAS BEEN MODIFIED WILL BE 

SUBJECT TO A RESTOCKING CHARGE. IF AN ANTENNA IS SO MODIFIED AS TO MAKE IT 

UNUSABLE, DIRECTIVE SYSTEMS RESERVES THE RIGHT TO REFUSE TO ACCEPT THE 

ANTENNA FOR RETURN.

 

 

 

Reviews: