background image

P a g e

 | 

 

 

DSE1276LY Rev 3/21 

                          (Can be up or down)

 

 

 

  

(Can be left or right)

 

 
 
4) 

Attach the feed line, and tape it to the mast. The connector should be sealed with electronic 

grade RTV or equivalent.  

 
5)  

The antenna SWR has been adjusted at the factory for less than 1.5:1. Additional 

tweaking can be accomplished by adjusting the distance between the driven element and R1 
and D1, or by adjusting the shape of the driven element. 

NOTE:

 

Do not attempt this 

adjustment unless the proper equipment and qualified personnel are available.

 

 
6) 

 If antennas are to be stacked, see "Instructions for Stacking Loop Yagis". 

 

 
Refer to photo and the next few steps for clarification on the Sub Boom: 
 

 

 
7) 

Mount the boom to mast bracket (square tubing piece) to the center boom section, 

using 8-32 X 2" screws, lock washers and nuts. Mount the boom to mast plate to this bracket 
using 8-

32 x 1 ¼” screws, lock washers and nuts. 

Note: There may be extra holes in the plate that 

may be used for different applications.

 

 
8) 

There are two sub-

boom brackets consisting of ½” aluminum angle and sub-boom 

plates. Mount the angle brackets on the front and rear boom sections using 8-

32 x 1 3/8” 

screws, lock washers and nuts. Mount the sub-boom plates to these brackets using 8-

32 x ½” 

screws, lock washers and nuts. 

Sub Boom Bracket

 

Sub Boom 
 Plate 

 

Sub Boom 

 

Reviews: